Posted
Sep 18, 2026
Oct 28, 2026
Anderson MHC Building Improvements (Design-Bid-Build)
The project consists of the repair of crack in the parking lot asphalt, repair of storm drainage ponding in the parking lot, the construction of a new accessible toilet on the first floor, and related plumbing, mechanical, and electrical systems modifications, and new fire alarm system throughout the building.
