Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide trash hauling, gasoline, diesel fuel, type 2 medium asphalt, ss1 tack, hot mix asphalt, 301 base, cold mix asphalt, manufactured brine, 404 wearing asphalt, asphalt emulsions,aluminum sulfate (liquid alum), sodium hypochlorite, hydrofluorsillicic, activated carbon, potassium permanganate, orthophosphate,sodium bisulfite. Chlorine gas. Liquid sodium aluminate.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Processed commodities.
Posted Date
Dec 23, 2025
Due Date
Jan 26, 2026
Release: Dec 23, 2025
Close: Jan 26, 2026
Processed commodities.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Fertilizer, Pesticide, Herbicide, and Related Commodities.
Posted Date
Jan 15, 2026
Due Date
Feb 11, 2026
Release: Jan 15, 2026
Close: Feb 11, 2026
Fertilizer, Pesticide, Herbicide, and Related Commodities.
AvailableConduct a comprehensive feasibility study evaluating bulk commodities ocean terminal opportunities, primarily along the Pacific Coast, to support Utah's economic development through enhanced port access for bulk commodities like minerals, agricultural products, and energy resources. The comparative feasibility study includes market demand analysis, facility evaluation, and investment recommendations.
Posted Date
Jan 16, 2026
Due Date
Feb 4, 2026
Release: Jan 16, 2026
Close: Feb 4, 2026
Conduct a comprehensive feasibility study evaluating bulk commodities ocean terminal opportunities, primarily along the Pacific Coast, to support Utah's economic development through enhanced port access for bulk commodities like minerals, agricultural products, and energy resources. The comparative feasibility study includes market demand analysis, facility evaluation, and investment recommendations.
AvailableThe project consists of performing upgrades to the existing traffic signal & equipment including new signal heads, mast arms, controller box, wiring, preemption, and video detection. Base bid the project consists of performing upgrades to the existing traffic signal & equipment including new signal heads, mast arms, controller box, wiring, preemption, and video detection. The base bid includes decorative supports. Alternate bid the alternate bid includes PennDot standard traffic signal supports modified to be painted autumn red to match the ones installed on water street (sr 0006)/ second street. The bidder must bid the alternate. If the alternate is awarded, the decorative items in the base bid will be eliminated. See attached files.
Posted Date
Jan 16, 2026
Due Date
Jan 30, 2026
Release: Jan 16, 2026
Close: Jan 30, 2026
The project consists of performing upgrades to the existing traffic signal & equipment including new signal heads, mast arms, controller box, wiring, preemption, and video detection. Base bid the project consists of performing upgrades to the existing traffic signal & equipment including new signal heads, mast arms, controller box, wiring, preemption, and video detection. The base bid includes decorative supports. Alternate bid the alternate bid includes PennDot standard traffic signal supports modified to be painted autumn red to match the ones installed on water street (sr 0006)/ second street. The bidder must bid the alternate. If the alternate is awarded, the decorative items in the base bid will be eliminated. See attached files.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →