Open RFP

City of Chenoa Phase 1 and 2 Water Main Replacements RFP

Description: The work generally consists of furnishing and installation of water system piping, fittings, valves, hydrants, line stops, services, connections, disconnections, and appurtenances for potable water. Installation will consist of 4”-8” PVC SDR 21 for open-cut and 4”-8” PVC C900 Certa-Lok Yelomine Restrained Joint for horizontal directional drill water main along the design route as shown on the plans. There will be three directional drills in total that cross East Cemetery Avenue (US Highway 24). There will be two jack and bore locations to cross the TP&W and Union Pacific Railroads. This work also includes surface restoration with various pavements, curbing, and sidewalks. This work shall include all labor, supervision, materials, supplies, transportation, equipment, and services necessary and required to perform the project as set forth in the Contract Documents

Buyer
City of Chenoa

City · IL, US

Released
-
Closes
Jan 12, 2027(60 days left)
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts