Special DistrictAR
Posted
-
Dec 1, 2026
Description: The work generally consists of furnishing and installation of water system piping, fittings, valves, hydrants, line stops, services, connections, disconnections, and appurtenances for potable water. Installation will consist of 4”-8” PVC SDR 21 for open-cut and 4”-8” PVC C900 Certa-Lok Yelomine Restrained Joint for horizontal directional drill water main along the design route as shown on the plans. There will be three directional drills in total that cross East Cemetery Avenue (US Highway 24). There will be two jack and bore locations to cross the TP&W and Union Pacific Railroads. This work also includes surface restoration with various pavements, curbing, and sidewalks. This work shall include all labor, supervision, materials, supplies, transportation, equipment, and services necessary and required to perform the project as set forth in the Contract Documents
City · IL, US
Decision makers connected to this RFP from City of Chenoa.
Adjacent opportunities open for bidding right now.
Special DistrictAR
Posted
-
Dec 1, 2026
Installation of approximately 7,490 L.F. of 6-inch D.I. potable water main on specified streets in Sherwood, Arkansas.
CityMA
Posted
Nov 11, 2026
Nov 25, 2026
Raw water transition main - phase 1.
CityIL
Posted
Oct 28, 2026
Dec 2, 2026
Work includes approx 3,901 LF 8" DI water main by open cut; 20 LF 12" sanitary sewer; 60 LF 8" storm sewer; 1,250 LF 1" type K water service by directional bore; 4,900 LF 2" hot mix asphalt surface mill and overlay over patches.
Special DistrictPA
Posted
Nov 4, 2026
Dec 8, 2026
ARV Replacements on Arterial Transmission Mains, Phase 2.
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File Retrieval