Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Carrollton is seeking bids for the construction of a new fire station facility (Fire Station 6) that includes site grading, erosion control, utilities, roadway paving, traffic signal, electrical and lighting improvements, and landscape/irrigation. The contractor shall furnish and install all materials and provide labor, equipment, services, and administration required for the project. The city intends to select the lowest combination of Base Bid plus Alternates.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Fire department station wear. These specifications describe the minimum specifications for Fire Department uniform trousers, shirts, sweaters, jackets, pullovers, and dress uniforms. The length of this contract will be for one (1) year from date of award. Four (4) additional one (1) year renewal options are also available if approved by both the City and the vendor.
Posted Date
Nov 30, 2025
Due Date
Dec 15, 2025
Release: Nov 30, 2025
Close: Dec 15, 2025
Fire department station wear. These specifications describe the minimum specifications for Fire Department uniform trousers, shirts, sweaters, jackets, pullovers, and dress uniforms. The length of this contract will be for one (1) year from date of award. Four (4) additional one (1) year renewal options are also available if approved by both the City and the vendor.
Premium
Access the largest public sector contact database
Release: Dec 2, 2025
Close: Dec 22, 2025
Construction of a fire station.
AvailableProcurement for furnishing and installing 14 full-frame, white vinyl single-hung energy-efficient replacement windows at Fire Station #6 (remove existing windows, install per manufacturer and code, seal/insulate, repair trim, dispose debris). Requires Manufacturer and Installer warranties, substantial completion within 180 days, mandatory onsite pre-bid meeting attendance, submission via the city's IonWave system, and compliance with insurance, E-Verify, and Georgia/City procurement documentation. Evaluation heavily weights Qualifications (35), Warranty/Post‑Construction Support (30) and Project Approach (25); Cost is 10%.
Posted Date
Dec 2, 2025
Due Date
Jan 6, 2026
Release: Dec 2, 2025
Close: Jan 6, 2026
Procurement for furnishing and installing 14 full-frame, white vinyl single-hung energy-efficient replacement windows at Fire Station #6 (remove existing windows, install per manufacturer and code, seal/insulate, repair trim, dispose debris). Requires Manufacturer and Installer warranties, substantial completion within 180 days, mandatory onsite pre-bid meeting attendance, submission via the city's IonWave system, and compliance with insurance, E-Verify, and Georgia/City procurement documentation. Evaluation heavily weights Qualifications (35), Warranty/Post‑Construction Support (30) and Project Approach (25); Cost is 10%.
AvailableConstruction of a new fire station.
Posted Date
Nov 12, 2025
Due Date
Dec 15, 2025
Release: Nov 12, 2025
Close: Dec 15, 2025
Construction of a new fire station.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis