Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project Includes rehabilitation of concrete rapid mix basin, replacement of sedimentation basins tube settlers, anthracite coal and sand media in 4 filters, all hydraulic operated valves with motor operated valves, filter control panels, high service pump VFD controller, filter effluent flow meters, 3-8" raw water intake ball check valves, furnishing and installing chemical transfer and feed pumps and day tanks, furnish and install additional SCADA computer, furnish additional lab equipment, clean sediment out of clearwell, furnish and install emergency generator and replace all ventilation fans and louvers. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide engineering services for water treatment plant phase iii pfas improvements.
Posted Date
Nov 17, 2025
Due Date
Dec 18, 2025
Release: Nov 17, 2025
Close: Dec 18, 2025
Provide engineering services for water treatment plant phase iii pfas improvements.
AvailableRequesting Proposal for Construction Manager at Risk. Project consists of improvements to the existing filtration and backwash system, baffling of the chlorine contact basin, zone 1/ zone 2 pumping capacity and associated electrical upgrades, and expansion of the powdered active carbon slurry system.
Posted Date
Nov 20, 2025
Due Date
Jan 16, 2026
Release: Nov 20, 2025
Close: Jan 16, 2026
Requesting Proposal for Construction Manager at Risk. Project consists of improvements to the existing filtration and backwash system, baffling of the chlorine contact basin, zone 1/ zone 2 pumping capacity and associated electrical upgrades, and expansion of the powdered active carbon slurry system.
AvailableWork consists of Replacement of approx. 125 LF of existing 24" infiltration gallery along the bank of the tongue river, raw water pumping improvements, water treatment plant improvements, and installation of a new SCADA system.
Posted Date
Nov 10, 2025
Due Date
Dec 18, 2025
Release: Nov 10, 2025
Close: Dec 18, 2025
Work consists of Replacement of approx. 125 LF of existing 24" infiltration gallery along the bank of the tongue river, raw water pumping improvements, water treatment plant improvements, and installation of a new SCADA system.
AvailableWater Treatment Plant Raw Water and Clarification Improvements CMAR.
Posted Date
Nov 3, 2025
Due Date
Dec 17, 2025
Release: Nov 3, 2025
Close: Dec 17, 2025
Water Treatment Plant Raw Water and Clarification Improvements CMAR.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis