Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 36,006 SF of walk removal; 3,115' of curb removal; 76 CY of excavation; 398 SY of subgrade compaction; 90' of fencing; 31,600 SF of 4" concrete walk; 1,008 SF of 6" concrete walk; erosion control; 117 CY of asphalt concrete base; 3,045' of curb, type 6; 3,028' of 4" unclassified pipe underdrains; See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Perform downtown building façade improvements and commercial roofing repair/replacement.
Posted Date
Dec 29, 2025
Due Date
Jan 12, 2026
Release: Dec 29, 2025
Close: Jan 12, 2026
Perform downtown building façade improvements and commercial roofing repair/replacement.
AvailableThe Borough of Milltown is soliciting bids for improvements to Foch Avenue.
Posted Date
Jan 8, 2026
Due Date
Jan 21, 2026
Release: Jan 8, 2026
Close: Jan 21, 2026
The Borough of Milltown is soliciting bids for improvements to Foch Avenue.
AvailableThe approximate quantities for the principal items of work under this contract are: 1847 LF - 6" c-900, PVC water main; 105 LF - 6" hdpe pipe (dr11) (directional bore); 520 LF - 3/4" service line; 380 LF - 2" PVC encasement (bored); 16 each - water service reconnection (complete in place); 2 each - tie-in to existing water system; 4 each - 6" gate valve with box; 4 each - fire hydrant assembly (complete); 100 lf - saw cut pavement/driveways (variable depth); 125 SY - remove and replace asphalt pavement (crush stone); 100 SY - remove and replace concrete drive; 50 Y - remove and replace concrete sidewalk; 100 SY - remove and replace concrete curb & gutter; 100 SY - borrow excavation (class 9) (fm); 0.25 acres - seeding and mulching; 1 each - 6" tapping sleeve and valve with box; 7 each - tree removal, all sizes.
Posted Date
Aug 1, 2025
Due Date
Jan 13, 2026
Release: Aug 1, 2025
Close: Jan 13, 2026
The approximate quantities for the principal items of work under this contract are: 1847 LF - 6" c-900, PVC water main; 105 LF - 6" hdpe pipe (dr11) (directional bore); 520 LF - 3/4" service line; 380 LF - 2" PVC encasement (bored); 16 each - water service reconnection (complete in place); 2 each - tie-in to existing water system; 4 each - 6" gate valve with box; 4 each - fire hydrant assembly (complete); 100 lf - saw cut pavement/driveways (variable depth); 125 SY - remove and replace asphalt pavement (crush stone); 100 SY - remove and replace concrete drive; 50 Y - remove and replace concrete sidewalk; 100 SY - remove and replace concrete curb & gutter; 100 SY - borrow excavation (class 9) (fm); 0.25 acres - seeding and mulching; 1 each - 6" tapping sleeve and valve with box; 7 each - tree removal, all sizes.
AvailableProcurement of services for furnishing and installing granite curb, sidewalks, brick pavers, and asphalt for streetscape and parking lot improvements along Franklin Street.
Posted Date
Dec 20, 2025
Due Date
Jan 21, 2026
Release: Dec 20, 2025
Close: Jan 21, 2026
Procurement of services for furnishing and installing granite curb, sidewalks, brick pavers, and asphalt for streetscape and parking lot improvements along Franklin Street.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →