Construction of 6,710 sf of new sidewalk and associated curbs, asphalt, landscaping, irrigation, stormwater planters, raised planter bed, lighting, and other ancillary requirements. Construction of a new 945 sf new concrete splash pad with water play structures, control panel, and associated water piping and drainage system. Connection of utilities to the site including water, sewer, storm, electrical service, and electrical circuits and conduits. Installation of 175 linear feet of new 3-inch water service line including a new 3-inch reduced pressure backflow device. Installation of approximately 230 linear feet of new 8-inch sewer lateral line. Construction of three (3) new storm water catch basins (excluding splash pad area drains) and 20 feet of 12-inch storm drain pipe. Furnish and install a new metal gazebo, complete with footings, structure, roof, gutters, and associated infrastructure for a completed gazebo 36-feet in diameter. Construction and/or installation of site furnishings, seating, drinking fountain, benches, trash facilities, and other furnishings as shown on the plans. Regrading and providing import top soil to provide drainage to one (1) surface area acre of park lawn area, reseed after grading. Import topsoil to be 620 cubic yards.
Available