Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Perform a city hall feasibility study, civic campus master planning, and existing city hall renovation analysis. Study will involve assessment of staffing needs, building size and configuration, design concepts, site requirements, construction costs and timelines to determine the optimal specification for a new city hall. Create a comprehensive master plan that addresses placement, expansion, parking landscaping, accessibility, connectivity, and integration with existing facilities. Assess the feasibility of two scenarios: Full modernization with system replacement and ADA upgrades to extend the facility's life; or minimal improvements focused on essential repairs to extend usability for about five years.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes heating, ventilation, and air conditioning (hvac) replacement services; remove three (3) old hvac units and install three (3) equivalent new units in their place, on the roof of city hall, provided by the contractor to city; unit #1: year installed was 2002. 15-ton carrier model. Manufacturer # 50hjq016-611qa, serial # 4502f88464. Located on the east side of city hall, it covers the council chamber area. ; unit #2: year installed was 2006. 30-ton carrier model. Manufacturer # 48ajd030-d-511ff, serial # 1706u07389. Located on the west side of city hall, it covers the entire west side of the building; unit #3: year installed was 2006. 20-ton carrier model. Manufacturer # 48ajd020-c-611ff, serial # 17069uo7380. Located on the east side of city hall, it covers most of the east side of the building. See outside link.
Posted Date
Nov 6, 2025
Due Date
Dec 12, 2025
Release: Nov 6, 2025
Close: Dec 12, 2025
Work includes heating, ventilation, and air conditioning (hvac) replacement services; remove three (3) old hvac units and install three (3) equivalent new units in their place, on the roof of city hall, provided by the contractor to city; unit #1: year installed was 2002. 15-ton carrier model. Manufacturer # 50hjq016-611qa, serial # 4502f88464. Located on the east side of city hall, it covers the council chamber area. ; unit #2: year installed was 2006. 30-ton carrier model. Manufacturer # 48ajd030-d-511ff, serial # 1706u07389. Located on the west side of city hall, it covers the entire west side of the building; unit #3: year installed was 2006. 20-ton carrier model. Manufacturer # 48ajd020-c-611ff, serial # 17069uo7380. Located on the east side of city hall, it covers most of the east side of the building. See outside link.
Replacement of the furnace at the town hall.
Posted Date
Dec 3, 2025
Due Date
Dec 19, 2025
Release: Dec 3, 2025
Close: Dec 19, 2025
Replacement of the furnace at the town hall.
AvailableHall Roof Replacement.
Posted Date
Nov 14, 2025
Due Date
Jan 7, 2026
Release: Nov 14, 2025
Close: Jan 7, 2026
Hall Roof Replacement.
AvailableRelease: Dec 7, 2025
Close: Dec 30, 2025
Replacement of Chiller #1 at Hall
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis