Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Prepare the site for the new sign foundation, including necessary grading, excavation, and compaction. Construct the new monument sign structure.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Monument signs replacements at multiple locations.
Posted Date
Nov 20, 2025
Due Date
Dec 17, 2025
Release: Nov 20, 2025
Close: Dec 17, 2025
Monument signs replacements at multiple locations.
AvailablePremium
Access the largest public sector contact database
Area rehab - monument restoration.
Posted Date
Nov 5, 2025
Due Date
Dec 18, 2025
Release: Nov 5, 2025
Close: Dec 18, 2025
Area rehab - monument restoration.
AvailableWork consists of the removal and replacement of the seawall cap, cleaning and restoration of the Perry Monument Plaza and stabilization, cleaning, and restoration of the monument. The existing seawall cap will be removed and replaced. The restoration of the plaza includes removal and replacement of deteriorate concrete sidewalk, concrete crack repair, the removal of the knee wall and moat surrounding the monument, installation of concrete bollards with chains connecting the bollards, and lighting upgrades. The stabilization and restoration of the monument includes polymer soil injections, spall repair, removal and replacement of stone, partial stone replacement, repoint mortar joints, replace brick behind stone, and apply waterproofing and anti-graffiti coating to monument.
Posted Date
Nov 19, 2025
Due Date
Dec 18, 2025
Release: Nov 19, 2025
Close: Dec 18, 2025
Work consists of the removal and replacement of the seawall cap, cleaning and restoration of the Perry Monument Plaza and stabilization, cleaning, and restoration of the monument. The existing seawall cap will be removed and replaced. The restoration of the plaza includes removal and replacement of deteriorate concrete sidewalk, concrete crack repair, the removal of the knee wall and moat surrounding the monument, installation of concrete bollards with chains connecting the bollards, and lighting upgrades. The stabilization and restoration of the monument includes polymer soil injections, spall repair, removal and replacement of stone, partial stone replacement, repoint mortar joints, replace brick behind stone, and apply waterproofing and anti-graffiti coating to monument.
AvailableInstallation of a monument school sign with LED display at school.
Posted Date
Dec 10, 2025
Due Date
Jan 23, 2026
Release: Dec 10, 2025
Close: Jan 23, 2026
Installation of a monument school sign with LED display at school.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis