Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work generally includes approximately 10,850 linear feet of cipp manhole to manhole lining of existing sanitary sewers, reinstatement of sanitary sewer laterals, and all necessary labor, materials and appurtenances for said construction.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The Alabama Department of Human Resources seeks qualified vendors to provide statewide slots for a Crisis Intervention Placement Program (CIPP), offering temporary congregate care, including room, board, and basic services, for children in state custody.
Posted Date
Dec 19, 2025
Due Date
Jan 16, 2026
Release: Dec 19, 2025
Close: Jan 16, 2026
The Alabama Department of Human Resources seeks qualified vendors to provide statewide slots for a Crisis Intervention Placement Program (CIPP), offering temporary congregate care, including room, board, and basic services, for children in state custody.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Perform on-call ultra-violet cured-in-place pipe (UV-CIPP) lining as well as contractors to perform manhole rehabilitation via the application of 100% solids epoxy coating.
Posted Date
Dec 12, 2025
Due Date
Jan 30, 2026
Release: Dec 12, 2025
Close: Jan 30, 2026
Perform on-call ultra-violet cured-in-place pipe (UV-CIPP) lining as well as contractors to perform manhole rehabilitation via the application of 100% solids epoxy coating.
AvailableProject consists of 420 LF of 8" GRP UV CIPP line between MH #128 - MH #83, as per contract documents; 385 LF of 8" GRP UV CIPP line between MH #17 - MH #16, as per contract documents; 349 LF of 8" GRP UV CIPP line between MH #242 - MH #243, as per contract documents; 236 LF of 8" GRP UV CIPP line between MH #165 - MH #164, as per contract documents; 248 LF of 8" GRP EV CIPP line between MH #40 - MH #39, as per contract documents; 204 LF of 8" GRP UV CIPP line between MH #240 - MH #241, as per contract documents; see the outside link for more details.
Posted Date
Dec 18, 2025
Due Date
Jan 23, 2026
Release: Dec 18, 2025
Close: Jan 23, 2026
Project consists of 420 LF of 8" GRP UV CIPP line between MH #128 - MH #83, as per contract documents; 385 LF of 8" GRP UV CIPP line between MH #17 - MH #16, as per contract documents; 349 LF of 8" GRP UV CIPP line between MH #242 - MH #243, as per contract documents; 236 LF of 8" GRP UV CIPP line between MH #165 - MH #164, as per contract documents; 248 LF of 8" GRP EV CIPP line between MH #40 - MH #39, as per contract documents; 204 LF of 8" GRP UV CIPP line between MH #240 - MH #241, as per contract documents; see the outside link for more details.
AvailableRemoval and replacement of existing concrete sidewalks, including the removal of tree roots, as needed, and all necessary restoration of the areas.
Posted Date
Jan 5, 2026
Due Date
Jan 22, 2026
Release: Jan 5, 2026
Close: Jan 22, 2026
Removal and replacement of existing concrete sidewalks, including the removal of tree roots, as needed, and all necessary restoration of the areas.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →