Retrieving RFP details
Release
Close
Beaufort-Jasper Water And Sewer Authority
Furnishing all materials required to replace secondary clarifier equipment suitable for gravity separation of mixed liquor solids in the activated sludge process in two (2) secondary clarifiers at the Water Reclamation Facility (PRIWRF). The scope of work includes reviewing as-builts drawings; survey and measurement of existing basins; design, manufacture and delivery of equipment; start-up services and training as outlined in the IFB.
2026-IFB-009 - pub - CIP-2507 Port Royal Water Reclamation F
zip
City of Casa Grande
Water reclamation facility security upgrade.
City and County of San Francisco
Provide water pollution control plant, secondary clarifiers rehabilitation. Separate the activated sludge in the mixed liquor from the treated wastewater. Return activated sludge is returned to the aeration tanks and waste activated sludge is transferred to the solids handling facilities.
City of Post Falls
Pre-construction and construction services for improvements to the water reclamation facility.
Release
Nov 03, 2025
Close
Dec 03, 2025