Summary
The scope of work includes but is not limited to; New 1.3MG buried concrete tank with stairway o I/O and valve vault piping o Mixing system. New valve vault. Temporary construction grading and final grading. New entry road and site fencing. Associated electrical work for the new facility including transformers and power panels. New radio at top of reservoir. Integration of all new equipment into existing District SCADA. Biological and environmental avoidance measures. Operational testing and commissioning of the new facility. Aggregates, asphalt, concrete material, slurry, low density cellular grout, pipe suppliers, draining systems pipe suppliers, precast materials, eros materials, analytical testing, cathodic protection, cctv, concrete structures, demolition, dewatering, electrical-building, erosion control, false work/scaffolding/framework, fencing, geotech engineers, landscaping/irrigation, reinforcing steel, shoring subs, soil remediation, structural steel, surveying, swpp plan only, tree removal/arborist, vibration monitoring, crane rental, conveyor/equipment rental, trucking.