Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 30 SY full depth asphalt patching (12")(level 1 superpave with 67-22); 168 LF storm drain pipe (15" equivlaent rcpa); 376 LF storm drain pipe (18" equivalent rcpa); 55 SY catch basin (cb-01); 55 SY remove/replace concrete driveway (6")(72'hr high early); 250 SY centipede sod; 3,000 LF cleaning existing ditches.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Dresurfacing east grafton rd east grafton rd.
Posted Date
Dec 2, 2025
Due Date
Jan 13, 2026
Release: Dec 2, 2025
Close: Jan 13, 2026
Dresurfacing east grafton rd east grafton rd.
AvailablePremium
Access the largest public sector contact database
Design-Build teams for Request for Proposals 26-107 for Alpha Loop Trail Design-Build from Haynes Bridge Rd to Encore Pkwy. This project is for the design and construction of a 12-foot wide lighted shared-use path connecting Haynes Bridge Road to Encore Parkway, approx. 1.2 miles.
Posted Date
Sep 25, 2025
Due Date
Dec 18, 2025
Release: Sep 25, 2025
Close: Dec 18, 2025
Design-Build teams for Request for Proposals 26-107 for Alpha Loop Trail Design-Build from Haynes Bridge Rd to Encore Pkwy. This project is for the design and construction of a 12-foot wide lighted shared-use path connecting Haynes Bridge Road to Encore Parkway, approx. 1.2 miles.
AvailableThe Georgia Department of Transportation (GDOT) issued an RFQ/ITB seeking prequalified contractors to perform Drainage Rehabilitation, Repair, Replacement and Miscellaneous Maintenance Services at I-75 Frontage Road in Clayton County, GA. Work includes mobilization/demobilization, traffic control, temporary stormwater flow control, excavation and sinkhole restoration, access and cleaning of approximately 374 linear feet of RCP pipeline of various diameters, pipe lining using fold-and-form/spin-cast methods for specified lengths, and pre/post-construction inspections. The contract work will be performed under GDOT’s Maintenance Master Services Agreement (MMSA) and must begin within 30 days after the Prework Meeting and be completed within 90 days thereafter.
Posted Date
Dec 9, 2025
Due Date
Jan 6, 2026
Release: Dec 9, 2025
Close: Jan 6, 2026
The Georgia Department of Transportation (GDOT) issued an RFQ/ITB seeking prequalified contractors to perform Drainage Rehabilitation, Repair, Replacement and Miscellaneous Maintenance Services at I-75 Frontage Road in Clayton County, GA. Work includes mobilization/demobilization, traffic control, temporary stormwater flow control, excavation and sinkhole restoration, access and cleaning of approximately 374 linear feet of RCP pipeline of various diameters, pipe lining using fold-and-form/spin-cast methods for specified lengths, and pre/post-construction inspections. The contract work will be performed under GDOT’s Maintenance Master Services Agreement (MMSA) and must begin within 30 days after the Prework Meeting and be completed within 90 days thereafter.
AvailableThe Finger Lakes DDSO (NYS Office for People With Developmental Disabilities) is soliciting bids to design a bathroom at the Marshall Rd IRA in Waterloo, NY (1519 Marshall Rd). A mandatory site visit is scheduled for December 8, 2025 at 10:00 AM and vendors who do not attend (or arrive late) will not have bids accepted. The solicitation opened on 2025-11-21 and closes on 2025-12-16, and bidders must request an invitation to bid via fax or email as directed.
Posted Date
Nov 21, 2025
Due Date
Dec 16, 2025
Release: Nov 21, 2025
Close: Dec 16, 2025
The Finger Lakes DDSO (NYS Office for People With Developmental Disabilities) is soliciting bids to design a bathroom at the Marshall Rd IRA in Waterloo, NY (1519 Marshall Rd). A mandatory site visit is scheduled for December 8, 2025 at 10:00 AM and vendors who do not attend (or arrive late) will not have bids accepted. The solicitation opened on 2025-11-21 and closes on 2025-12-16, and bidders must request an invitation to bid via fax or email as directed.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis