Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Design-Build teams for Request for Proposals 26-107 for Alpha Loop Trail Design-Build from Haynes Bridge Rd to Encore Pkwy. This project is for the design and construction of a 12-foot wide lighted shared-use path connecting Haynes Bridge Road to Encore Parkway, approx. 1.2 miles.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Design/Build Services for Spivey Trail Drainage Improvement Project for Clayton County (County), Georgia.
Posted Date
Dec 5, 2025
Due Date
Jan 22, 2026
Release: Dec 5, 2025
Close: Jan 22, 2026
Design/Build Services for Spivey Trail Drainage Improvement Project for Clayton County (County), Georgia.
AvailableDESIGN-BUILD: Project involves design-build services for the route 50 bridge over cedar swamp creek project.
Posted Date
Dec 2, 2024
Due Date
Jan 8, 2026
Release: Dec 2, 2024
Close: Jan 8, 2026
DESIGN-BUILD: Project involves design-build services for the route 50 bridge over cedar swamp creek project.
AvailableDESIGN-BUILD services for Bridge Group 16D Route 6 Johnston. The proposals would include completely replacing three (3) bridges (Bridge Nos. 060701, 060801, and 060901) along the US Route 6 corridor; realigning the US Route 6 westbound off-ramp to US Route 6A westbound to improve intersection geometry and safety.
Posted Date
Nov 26, 2025
Due Date
Mar 9, 2026
Release: Nov 26, 2025
Close: Mar 9, 2026
DESIGN-BUILD services for Bridge Group 16D Route 6 Johnston. The proposals would include completely replacing three (3) bridges (Bridge Nos. 060701, 060801, and 060901) along the US Route 6 corridor; realigning the US Route 6 westbound off-ramp to US Route 6A westbound to improve intersection geometry and safety.
AvailablePedestrian bridge design, build, operate, and transfer project. See attached file.
Posted Date
Nov 25, 2025
Due Date
Dec 22, 2025
Release: Nov 25, 2025
Close: Dec 22, 2025
Pedestrian bridge design, build, operate, and transfer project. See attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis