Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Madera County is soliciting competitive bids to construct the Chowchilla Subbasin Recharge Project 1, a groundwater recharge project in Madera County, California. The scope includes construction of recharge-related facilities and site work, with a mandatory pre-bid meeting on January 9, 2026, and questions due January 16, 2026. Bids are due January 23, 2026 at 2:00 pm PT via the County’s BidExpress portal.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes 1 LS excavate channel; 38 CY reinforced concrete control box; 51 CY reinforced concrete pump box; 64 CY reinforced concrete fish screen vault; 1 LS f&i steel pump frame & plank grating; 611 CY f&i class ii rip-rap; 10 CY f&i class ii aggregate base 3" thick on drive road; 1,604 LF f&i 27" pvd pip sdr 41; 4800 SF revegetation; 1 EA fluid/cuttings containment and disposal; 400 LF test hole drilling; 470 LF blank monitoring well casing; 400 LF test hole abandonment.
Posted Date
Nov 19, 2025
Due Date
Jan 23, 2026
Release: Nov 19, 2025
Close: Jan 23, 2026
Work includes 1 LS excavate channel; 38 CY reinforced concrete control box; 51 CY reinforced concrete pump box; 64 CY reinforced concrete fish screen vault; 1 LS f&i steel pump frame & plank grating; 611 CY f&i class ii rip-rap; 10 CY f&i class ii aggregate base 3" thick on drive road; 1,604 LF f&i 27" pvd pip sdr 41; 4800 SF revegetation; 1 EA fluid/cuttings containment and disposal; 400 LF test hole drilling; 470 LF blank monitoring well casing; 400 LF test hole abandonment.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of a water pipeline and turnouts, including piping, pump stations, control boxes, agricultural turnouts, basin turnouts, diversions, valves, fittings, trench excavation, backfill, and paving repairs.
Posted Date
Jan 2, 2026
Due Date
Jan 23, 2026
Release: Jan 2, 2026
Close: Jan 23, 2026
Construction of a water pipeline and turnouts, including piping, pump stations, control boxes, agricultural turnouts, basin turnouts, diversions, valves, fittings, trench excavation, backfill, and paving repairs.
AvailableProject consists of the clear and grubbing of approx. 35.3 acres of district property, placement of approx. 20,365 CY (as in-place fill) of material to construct the basin and channel levees, grading of approx. 27.98 acres of basin and channel bottoms, ripping and floating of basin bottoms, and the construction of the inter-basin structure.
Posted Date
Jan 6, 2026
Due Date
Feb 2, 2026
Release: Jan 6, 2026
Close: Feb 2, 2026
Project consists of the clear and grubbing of approx. 35.3 acres of district property, placement of approx. 20,365 CY (as in-place fill) of material to construct the basin and channel levees, grading of approx. 27.98 acres of basin and channel bottoms, ripping and floating of basin bottoms, and the construction of the inter-basin structure.
AvailableMadera County Public Works is soliciting bids for tree mitigation and restoration associated with the Road 200 Bridge at Fine Gold Creek. The scope centers on mitigation/restoration and revegetation work connected to environmental commitments for the bridge project. Questions are due January 21, 2026, and proposals are due January 29, 2026.
Posted Date
-
Due Date
Jan 29, 2026
Close: Jan 29, 2026
Madera County Public Works is soliciting bids for tree mitigation and restoration associated with the Road 200 Bridge at Fine Gold Creek. The scope centers on mitigation/restoration and revegetation work connected to environmental commitments for the bridge project. Questions are due January 21, 2026, and proposals are due January 29, 2026.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →