Summary
Work includes svm cip chiller replacement 200t - replacement of an existing 200-ton centrifugal chiller, cooling tower, and associated mechanical, electrical, and controls systems. Svm cip lab air handler - replacement of an existing air handling unit and associated distribution system components primarily serving the laboratory and other critical care areas. Thermal fluid plant - replacement of existing boilers and thermal fluid heaters with new high-efficiency boiler equipment, associated mechanical, electrical, and control systems; connections to existing heating water, fuel, flue, condensate, and power systems; and construction of a structural bridge to support associated piping.