Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Removal and replacement of chiller and cooling tower.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide all labor, material, supplies, transportation, permits, license and qualified supervision for project 565-24-113, replace auxiliary chiller.
Posted Date
Nov 17, 2025
Due Date
Jan 26, 2026
Release: Nov 17, 2025
Close: Jan 26, 2026
Provide all labor, material, supplies, transportation, permits, license and qualified supervision for project 565-24-113, replace auxiliary chiller.
AvailablePremium
Access the largest public sector contact database
Commonwealth University of Pennsylvania – Lock Haven Campus (PASSHE) is soliciting bids to replace the Stevenson Library chiller system, including demolition of the existing roof‑mounted unit and installation of a new air‑cooled pad‑mounted scroll chiller, buffer tank, pumps, VFDs, and associated BAS modifications. Bids are submitted via PennBid; a mandatory pre‑bid is scheduled for Nov 20, 2025, and bids are due Dec 17, 2025 at 1:00 PM Eastern.
Posted Date
Nov 13, 2025
Due Date
Dec 17, 2025
Release: Nov 13, 2025
Close: Dec 17, 2025
Commonwealth University of Pennsylvania – Lock Haven Campus (PASSHE) is soliciting bids to replace the Stevenson Library chiller system, including demolition of the existing roof‑mounted unit and installation of a new air‑cooled pad‑mounted scroll chiller, buffer tank, pumps, VFDs, and associated BAS modifications. Bids are submitted via PennBid; a mandatory pre‑bid is scheduled for Nov 20, 2025, and bids are due Dec 17, 2025 at 1:00 PM Eastern.
AvailableThe project to replace the end of lifecycle chillers at buildings 1, 2 and 104 shall include the following: The project shall replace the standby chiller located on the roof of building 1 above the kitchen. Replace building 2 chillers 1 and 2, modifications to chilled water piping in basement to utilize campus chilled water as backup and remove chiller 3. Replace building 104 operating room backup chiller and relocate to roof of building 104, to include additional piping to relocate chiller to roof. See attached file.
Posted Date
Nov 6, 2025
Due Date
Jan 5, 2026
Release: Nov 6, 2025
Close: Jan 5, 2026
The project to replace the end of lifecycle chillers at buildings 1, 2 and 104 shall include the following: The project shall replace the standby chiller located on the roof of building 1 above the kitchen. Replace building 2 chillers 1 and 2, modifications to chilled water piping in basement to utilize campus chilled water as backup and remove chiller 3. Replace building 104 operating room backup chiller and relocate to roof of building 104, to include additional piping to relocate chiller to roof. See attached file.
AvailableThe Department of Veterans Affairs (VISN 6: Mid-Atlantic Health Care Network) issued Solicitation 36C24626B0004 to remove and replace the existing 120-ton auxiliary chiller at Building 3 located at 2300 Ramsey Street, Fayetteville, NC. The work includes replacement/installation of piping, valves, supports, controls, integration with the existing Building Automation System (BACNET-compliant controller), replacement of two 250 gpm pumps, and updating BAS graphics and alarms; all work must comply with VA master specifications, NFPA, and UL standards. Period of performance is six months from Notice to Proceed; the posting is open on SAM.gov and is NOT a grant.
Posted Date
Dec 9, 2025
Due Date
Jan 26, 2026
Release: Dec 9, 2025
Close: Jan 26, 2026
The Department of Veterans Affairs (VISN 6: Mid-Atlantic Health Care Network) issued Solicitation 36C24626B0004 to remove and replace the existing 120-ton auxiliary chiller at Building 3 located at 2300 Ramsey Street, Fayetteville, NC. The work includes replacement/installation of piping, valves, supports, controls, integration with the existing Building Automation System (BACNET-compliant controller), replacement of two 250 gpm pumps, and updating BAS graphics and alarms; all work must comply with VA master specifications, NFPA, and UL standards. Period of performance is six months from Notice to Proceed; the posting is open on SAM.gov and is NOT a grant.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis