Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Town of Chester is soliciting bids for the Chester Depot Street Sewer Main (Contract 3) to install gravity sewer main, perform railroad crossings via jack-and-bore, and complete pavement restoration. The project is partially funded by the Vermont Drinking and/or Clean Water State Revolving Fund and requires compliance with federal wage rates (Davis-Bacon), BABAA, AIS, bonds, and DBE requirements. Bidding documents are distributed by the Issuing Office (Copy World LLC) and bids are due Jan 21, 2026.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Construction of the Depot Street Sewer Main, including gravity sewer main installation, railroad crossings via jack and bore, and pavement restoration.
Posted Date
Dec 15, 2025
Due Date
Jan 21, 2026
Release: Dec 15, 2025
Close: Jan 21, 2026
Construction of the Depot Street Sewer Main, including gravity sewer main installation, railroad crossings via jack and bore, and pavement restoration.
AvailablePremium
Access the largest public sector contact database
The work includes: installation of gravity and force main sewer pipes, sewer manholes, air release manholes, pump station, trench repair, earthwork, and all associated work as shown on the contract drawings and documents. The work also includes trenching, backfilling, and road pavement repair associated with utility installation. The work includes, but is not limited to: The installation of 2,000 LF of gravity sewer, 1,530 LF of new sewer force main, installation of precast manholes, installation of residential services, and associated construction; Road repair, including the removal of bituminous pavement, trench paving, street reconstruction, loam, and seeding; Installation of the pump station, valve pit, electrical controls, emergency generator, and drive for access to the pump station.
Posted Date
Dec 8, 2025
Due Date
Jan 14, 2026
Release: Dec 8, 2025
Close: Jan 14, 2026
The work includes: installation of gravity and force main sewer pipes, sewer manholes, air release manholes, pump station, trench repair, earthwork, and all associated work as shown on the contract drawings and documents. The work also includes trenching, backfilling, and road pavement repair associated with utility installation. The work includes, but is not limited to: The installation of 2,000 LF of gravity sewer, 1,530 LF of new sewer force main, installation of precast manholes, installation of residential services, and associated construction; Road repair, including the removal of bituminous pavement, trench paving, street reconstruction, loam, and seeding; Installation of the pump station, valve pit, electrical controls, emergency generator, and drive for access to the pump station.
AvailableConstruction contract for Main Street sewer extension: install ~2,000 linear feet of gravity sewer, ~1,530 linear feet of sewer force main, precast and air release manholes, residential services, pump station (valve pit, electrical controls, emergency generator), trenching, backfill, earthwork, and road/trench paving and restoration. Requires bidder qualifications, 5% bid bond, 100% performance/payment bonds, and a mandatory pre-bid conference.
Posted Date
Dec 8, 2025
Due Date
Jan 14, 2026
Release: Dec 8, 2025
Close: Jan 14, 2026
Construction contract for Main Street sewer extension: install ~2,000 linear feet of gravity sewer, ~1,530 linear feet of sewer force main, precast and air release manholes, residential services, pump station (valve pit, electrical controls, emergency generator), trenching, backfill, earthwork, and road/trench paving and restoration. Requires bidder qualifications, 5% bid bond, 100% performance/payment bonds, and a mandatory pre-bid conference.
AvailableThe Work under this contract includes but is not limited to installation of a cured-in-place pipe liner of approx 1,824 LF within a 26" x 36" brick sanitary sewer main located beneath Center Street NE. Work also includes the installation and maintenance of bypass sewer piping, reinstatement of service laterals and collector sewer connections, rehabilitation of existing sewer manholes, and repair at a utility cross-bored through the brick sewer.
Posted Date
Dec 15, 2025
Due Date
Jan 20, 2026
Release: Dec 15, 2025
Close: Jan 20, 2026
The Work under this contract includes but is not limited to installation of a cured-in-place pipe liner of approx 1,824 LF within a 26" x 36" brick sanitary sewer main located beneath Center Street NE. Work also includes the installation and maintenance of bypass sewer piping, reinstatement of service laterals and collector sewer connections, rehabilitation of existing sewer manholes, and repair at a utility cross-bored through the brick sewer.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis