Retrieving RFP details
Release
Close
San Francisco Public Utilities Commission (SFPUC)
Re-establish the flow path through the original spillway channel of the Dam spillway and to replace the bridge deck of the Dam Bridge, to extend the service life of the bridge until permanent improvements can be made; excavation and removal of landslide debris from Dam spillway discharge channel side embankment and bank erosion protection to re-establish original discharge channel flow path; replacement of existing damaged 1” to 2” – thick concrete overlay atop the Dam Bridge deck with new composite polyester polymer concrete as well as patch repair crack and voids in the bridge deck, girders and soffit.
Cherry Valley Dam Spillway Short-Term Improvement and Eleanor Dam Bridge Interim Repair - AFB
zip
U.S. Army Engineer District Seattle
Provide spillway gate replacments. Replacement spillway gates components include: 1. Fabricate minimum five (5) and maximum eleven (11) new vertical lift steel spillway gates offsite Including paint, non-destructive testing (NDT), seals and seal heaters, cathodic protection, wheels, dogging and latching mechanisms. See attached file.
Massachusetts Executive Office of Energy and Environmental Affairs
The Massachusetts Executive Office of Energy and Environmental Affairs (EEA) is soliciting responses under the Dam and Seawall Repair or Removal Program to support loan financing for local government infrastructure projects involving dams, seawalls/coastal structures, and inland levees/flood control structures. Responses are due December 17, 2025 at 11:59 PM Eastern; the solicitation is currently open on COMMBUYS.
City of Custer
Dam Construction.
Release
Nov 13, 2025
Close
Dec 11, 2025