Summary
Re-establish the flow path through the original spillway channel of the Dam spillway and to replace the bridge deck of the Dam Bridge, to extend the service life of the bridge until permanent improvements can be made; excavation and removal of landslide debris from Dam spillway discharge channel side embankment and bank erosion protection to re-establish original discharge channel flow path; replacement of existing damaged 1" to 2" - thick concrete overlay atop the Dam Bridge deck with new composite polyester polymer concrete as well as patch repair crack and voids in the bridge deck, girders and soffit.