Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project consists of rehabilitating the existing Cherry Run Pump Station with two (2) new 300GPM pumps, extending the existing 12-force main serving Cherry Run and other west side pump stations by 1,380 LF (LF) along Plymouth Street and tie-in to the existing 18-inch force main at the WWTP, and replace approximately 2,200 LF of existing 12" cast iron force main and 4,400 LF of existing 8" cast ion/asbestos cement force main with new PVC force main of the same size.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes : demolition and removal of 1 existing wastewater ejector pump station, installation of 1 wastewater submersible pump station and valve vault, installation of approx. 670 LF of 4" HDPE DR 17 sewer force main, and other related tasks.
Posted Date
Dec 17, 2025
Due Date
Jan 28, 2026
Release: Dec 17, 2025
Close: Jan 28, 2026
Work includes : demolition and removal of 1 existing wastewater ejector pump station, installation of 1 wastewater submersible pump station and valve vault, installation of approx. 670 LF of 4" HDPE DR 17 sewer force main, and other related tasks.
AvailableThe project includes the following work: CIPP lining 3,600 LF of 36" force main, installation of new dry weather pumps at pump station, wet well top slab reconstruction, existing building demolitions, electrical upgrades, and monorail crane installation.
Posted Date
Jun 23, 2025
Due Date
Jan 13, 2026
Release: Jun 23, 2025
Close: Jan 13, 2026
The project includes the following work: CIPP lining 3,600 LF of 36" force main, installation of new dry weather pumps at pump station, wet well top slab reconstruction, existing building demolitions, electrical upgrades, and monorail crane installation.
Project consists of constructing a replacement gunning sanitary sewer pump station and appurtenances, 8" and 12" gravity sewer lines and appurtenances, 8-inch force main including horizontal directional drilling (hdd) crossing of beech fork, and 20" and 16" water main installation including hdd.
Posted Date
Dec 23, 2025
Due Date
Jan 20, 2026
Release: Dec 23, 2025
Close: Jan 20, 2026
Project consists of constructing a replacement gunning sanitary sewer pump station and appurtenances, 8" and 12" gravity sewer lines and appurtenances, 8-inch force main including horizontal directional drilling (hdd) crossing of beech fork, and 20" and 16" water main installation including hdd.
AvailableWork includes : rehabilitation of a 40 million gallon per day (mgd) pump station, including replacement of instrumentation and controls equipment.
Posted Date
Dec 16, 2025
Due Date
Jan 20, 2026
Release: Dec 16, 2025
Close: Jan 20, 2026
Work includes : rehabilitation of a 40 million gallon per day (mgd) pump station, including replacement of instrumentation and controls equipment.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →