Retrieving RFP details
Release
Close
City of Washington
The project consists of rehabilitating the existing Cherry Run Pump Station with two (2) new 300GPM pumps, extending the existing 12-force main serving Cherry Run and other west side pump stations by 1,380 LF (LF) along Plymouth Street and tie-in to the existing 18-inch force main at the WWTP, and replace approximately 2,200 LF of existing 12" cast iron force main and 4,400 LF of existing 8" cast ion/asbestos cement force main with new PVC force main of the same size.
King County
rehabilitate the east force main of the Murray Pump Station, approx. 350 LF of 27" bar-wrapped concrete cylinder pipe (CCP) and install two vacuum relief valve assemblies. The work includes but is not limited to installation of a below grade precast concrete structure to house the relief valve assembly, installation of a 2nd assembly within the Murray Pump Station equipment room, sewer diversion to the west force main during rehabilitation, and restoration of concrete panels along Beach Dr SW, and all other work required in the Contract documents.
Township of South Hanover
Construction of a new pump station with a wet well and control building a new force main from the new pump station to an existing manhole lining of connecting manholes and site work.
City of Johnson City
Construction of a new gravity interceptor, pump station, and force main in Washington County, Tennessee. The project generally includes a new 18" gravity interceptor, package wastewater pump station, solids grinder, 12" force main, surge valve, Yard piping and valving, electrical, standby generator, site work, and paving. An existing pump station will also be demolished after the new station is operational.
Release
-
Close
Nov 13, 2025