Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This project consists approx. a major HVAC replacement and best practice upgrade to the existing 120,000 SF terminal building. This project includes approx. the replacement of air-cooled chillers and associated pumps and instrumentation, boilers and associated pumps and instrumentation, seven modular indoor air handling units, 85 fan powered terminal units, exhaust fans, standard air terminals, fan coils, unit heaters, air doors, VFDs and associated instrumentation, hot water heaters, the temperature control system and select ductwork and piping modifications. Heated hot water for the facility will be converted from 180F to 140F. The project also includes approximately 8,000 SF of reroofing under the chillers and a chiller platform expansion. See outside links for more details.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work consists of several work packages to enable and support the upcoming concourse b addition. Work packages a and b include watermain, sanitary sewer, storm sewer and site grading. Work package c includes airfield pavement construction consisting of excavation, base course construction, asphalt paving, concrete paving, airfield lighting, and pavement marking.
Posted Date
Jan 14, 2026
Due Date
Feb 10, 2026
Release: Jan 14, 2026
Close: Feb 10, 2026
Work consists of several work packages to enable and support the upcoming concourse b addition. Work packages a and b include watermain, sanitary sewer, storm sewer and site grading. Work package c includes airfield pavement construction consisting of excavation, base course construction, asphalt paving, concrete paving, airfield lighting, and pavement marking.
AvailableHvac replacement
Posted Date
Nov 25, 2025
Due Date
Jan 27, 2026
Release: Nov 25, 2025
Close: Jan 27, 2026
Hvac replacement
AvailableShoemaker HVAC Replacement.
Posted Date
Mar 9, 2025
Due Date
Feb 5, 2026
Release: Mar 9, 2025
Close: Feb 5, 2026
Shoemaker HVAC Replacement.
AvailableReplacement of HVAC systems, including air handlers and condensers, at Herrington Hall.
Posted Date
Jan 29, 2026
Due Date
Feb 18, 2026
Release: Jan 29, 2026
Close: Feb 18, 2026
Replacement of HVAC systems, including air handlers and condensers, at Herrington Hall.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis