Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The University of Iowa seeks services to modernize freight elevator #3 on the west side of the Chemistry Building. The project includes professional design services and construction to modernize the elevator, as well as adding an access stairwell to the elevator penthouse. Bids are being accepted via the University's BidExpress portal with a published deadline shown below.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The purpose of this project is to obtain a service to rehabilitate the freight elevator. This project will consist of removing the jack assembly, including handling the disposal of waste hydraulic fluid, installing a protective casing around the jack assembly, installing a new jack assembly, demolishing the elevator interior, installing the new elevator interior, demolishing the existing elevator controller, demolishing the existing elevator pump and housing unit, installing a new elevator controller, installing a new elevator pump and housing unit, demolishing and replacing the door and hallway fixtures, refurbishing and/or replacing elevator door assemblies, fireproofing both elevator shaft and mechanical room, installing a split-system hvac unit, and all other work described in the plan set and specifications.
Posted Date
Nov 3, 2025
Due Date
Dec 17, 2025
Release: Nov 3, 2025
Premium
Access the largest public sector contact database
Close: Dec 17, 2025
The purpose of this project is to obtain a service to rehabilitate the freight elevator. This project will consist of removing the jack assembly, including handling the disposal of waste hydraulic fluid, installing a protective casing around the jack assembly, installing a new jack assembly, demolishing the elevator interior, installing the new elevator interior, demolishing the existing elevator controller, demolishing the existing elevator pump and housing unit, installing a new elevator controller, installing a new elevator pump and housing unit, demolishing and replacing the door and hallway fixtures, refurbishing and/or replacing elevator door assemblies, fireproofing both elevator shaft and mechanical room, installing a split-system hvac unit, and all other work described in the plan set and specifications.
AvailableThe purpose of this project is to obtain a service to rehabilitate the freight elevator. This project will consist of removing the jack assembly, including handling the disposal of waste hydraulic fluid, installing a protective casing around the jack assembly, installing a new jack assembly, demolishing the elevator interior, installing the new elevator interior, demolishing the existing elevator controller, demolishing the existing elevator pump and housing unit, installing a new elevator controller, installing a new elevator pump and housing unit, demolishing and replacing the door and hallway fixtures, refurbishing and/or replacing elevator door assemblies, fireproofing both elevator shaft and mechanical room, installing a split-system hvac unit, and all other work described in the plan set and specifications.
Posted Date
Nov 3, 2025
Due Date
Dec 17, 2025
Release: Nov 3, 2025
Close: Dec 17, 2025
The purpose of this project is to obtain a service to rehabilitate the freight elevator. This project will consist of removing the jack assembly, including handling the disposal of waste hydraulic fluid, installing a protective casing around the jack assembly, installing a new jack assembly, demolishing the elevator interior, installing the new elevator interior, demolishing the existing elevator controller, demolishing the existing elevator pump and housing unit, installing a new elevator controller, installing a new elevator pump and housing unit, demolishing and replacing the door and hallway fixtures, refurbishing and/or replacing elevator door assemblies, fireproofing both elevator shaft and mechanical room, installing a split-system hvac unit, and all other work described in the plan set and specifications.
AvailableThe Government Publishing Office (GPO) is soliciting architectural and engineering (A/E) design services to replace and/or retrofit Freight Elevator #12 in Building A at the GPO facility in Washington, DC. The A/E firm will provide investigation of existing conditions, review as-built drawings, progressive design deliverables (35%, 65%, 95%, 100%), cost estimates, bid phase services, construction period services, and final record/as-built drawings. Proposals will be evaluated chiefly on technical capability, design management approach, relevant experience, key personnel qualifications, and past performance; a mandatory site visit is scheduled for December 17, 2025.
Posted Date
Dec 5, 2025
Due Date
Jan 16, 2026
Release: Dec 5, 2025
Close: Jan 16, 2026
The Government Publishing Office (GPO) is soliciting architectural and engineering (A/E) design services to replace and/or retrofit Freight Elevator #12 in Building A at the GPO facility in Washington, DC. The A/E firm will provide investigation of existing conditions, review as-built drawings, progressive design deliverables (35%, 65%, 95%, 100%), cost estimates, bid phase services, construction period services, and final record/as-built drawings. Proposals will be evaluated chiefly on technical capability, design management approach, relevant experience, key personnel qualifications, and past performance; a mandatory site visit is scheduled for December 17, 2025.
AvailableMaine Township High School District 207 is soliciting sealed bids for Maine West BP 1 – Freight Elevator Modernization as part of its Summer 2026 projects. Bids are due December 16, 2025 at 1:00 PM at the District Administration Building in Park Ridge, IL, with bid documents available via BuildingConnected and a pre‑bid meeting on December 4, 2025.
Posted Date
Nov 20, 2025
Due Date
Dec 16, 2025
Release: Nov 20, 2025
Close: Dec 16, 2025
Maine Township High School District 207 is soliciting sealed bids for Maine West BP 1 – Freight Elevator Modernization as part of its Summer 2026 projects. Bids are due December 16, 2025 at 1:00 PM at the District Administration Building in Park Ridge, IL, with bid documents available via BuildingConnected and a pre‑bid meeting on December 4, 2025.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis