Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
A project to repave and re-stripe the entire employee parking lot area (approximately 19,000 square feet area), with installation of conduit and concrete pads for future lighting and traffic control devices. There are also minor concrete apron repairs to an existing trench drain.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Placing approx. (2,053 SY at 200 lbs. per square yard) Type C hotlaid asphalt cement over a stone base; placing approx. 400 LF of concrete curb and gutter; the parking lot located in front of the EOC will include parking spaces 20' in length, 9' in width, one line on each side, and two lines of parking in the center of the lot, three handicap spaces, including one being van accessible; include milling of 4,297 SY of the existing pavement at a 2" depth before placing asphalt at 165 lb. per square yard.
Posted Date
-
Due Date
Jan 20, 2026
Release: -
Close: Jan 20, 2026
Placing approx. (2,053 SY at 200 lbs. per square yard) Type C hotlaid asphalt cement over a stone base; placing approx. 400 LF of concrete curb and gutter; the parking lot located in front of the EOC will include parking spaces 20' in length, 9' in width, one line on each side, and two lines of parking in the center of the lot, three handicap spaces, including one being van accessible; include milling of 4,297 SY of the existing pavement at a 2" depth before placing asphalt at 165 lb. per square yard.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of parking lot project.
Posted Date
Jan 3, 2026
Due Date
Jan 28, 2026
Release: Jan 3, 2026
Close: Jan 28, 2026
Work consists of parking lot project.
AvailableWork includes parking lot resurfacing and striping at city facilities, including city buildings, parks, libraries, fire stations, and athletic complexes, on an as-needed basis. Parking lot sizes vary based on location. Basic surface preparation - light cleaning or blowing off debris to ensure paint adhesion and visibility. Power washing may be required in areas with oil, grease, grime, or dirt accumulation that could prevent paint from adhering properly. Crack sealing - identification and sealing of surface cracks using hot-applied or cold-applied sealants to prevent water infiltration and extend pavement life. Edge grinding (if applicable) - grinding or milling of pavement edges to ensure smooth transitions between resurfaced and existing areas. See outside link.
Posted Date
Dec 22, 2025
Due Date
Jan 13, 2026
Release: Dec 22, 2025
Close: Jan 13, 2026
Work includes parking lot resurfacing and striping at city facilities, including city buildings, parks, libraries, fire stations, and athletic complexes, on an as-needed basis. Parking lot sizes vary based on location. Basic surface preparation - light cleaning or blowing off debris to ensure paint adhesion and visibility. Power washing may be required in areas with oil, grease, grime, or dirt accumulation that could prevent paint from adhering properly. Crack sealing - identification and sealing of surface cracks using hot-applied or cold-applied sealants to prevent water infiltration and extend pavement life. Edge grinding (if applicable) - grinding or milling of pavement edges to ensure smooth transitions between resurfaced and existing areas. See outside link.
AvailableWork includes reconstruction of the admin building overflow parking lot, 2" milling to remove existing asphalt, 2" surface type c asphalt, 28 parking spots, 4 handicapped spots and blue paint to be used for handicapped spot stripping
Posted Date
Nov 6, 2025
Due Date
Jan 13, 2026
Release: Nov 6, 2025
Close: Jan 13, 2026
Work includes reconstruction of the admin building overflow parking lot, 2" milling to remove existing asphalt, 2" surface type c asphalt, 28 parking spots, 4 handicapped spots and blue paint to be used for handicapped spot stripping
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →