Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes construction of approx. 11,700 LF of 8" HDPE potable water main, including fire hydrants, isolation gate valves and other appurtenances. Includes 8,700 LF of 8" HDPE waterline construction - directional bore; 3,000 LF of 8" DIP waterline construction - open cut; 11,700 LF of leakage testing; see outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work is to include installation of approx. 50,000 LF of 8" waterline, 7,700 LF of 6" waterline, 31,700 LF of 4" waterline, and 2,520 LF of 3" waterline and other appurtenances, service meters with telemetry, a duplex hydropneumatic pump station with all piping telemetry, controls and other equipment as shown.
Posted Date
-
Due Date
Dec 18, 2025
Close: Dec 18, 2025
Work is to include installation of approx. 50,000 LF of 8" waterline, 7,700 LF of 6" waterline, 31,700 LF of 4" waterline, and 2,520 LF of 3" waterline and other appurtenances, service meters with telemetry, a duplex hydropneumatic pump station with all piping telemetry, controls and other equipment as shown.
Premium
Access the largest public sector contact database
Procurement of construction services for two projects: Contract #2 involves site development and installation of a 122,000-gallon water storage tank with appurtenances, and Contract #3 involves installation of approximately 2,950 LF of 8" PVC water line and related appurtenances.
Posted Date
-
Due Date
Dec 18, 2025
Close: Dec 18, 2025
Procurement of construction services for two projects: Contract #2 involves site development and installation of a 122,000-gallon water storage tank with appurtenances, and Contract #3 involves installation of approximately 2,950 LF of 8" PVC water line and related appurtenances.
AvailableRemoval of existing asphalt and existing concrete sidewalks and gutters in pipeline and service line paths. All removed materials will be replaced to match existing, Installation of new 12" C900 PVC water pipeline with all the valves and fittings, Installation of new 6" C900 PVC water pipeline with all the valves and fittings. Removal and replacement of existing fire hydrants. Clean, disinfect, and pressure test new water pipelines. Installation of a new altitude and pressure relief valve vault at the water tower and connect to waterline coming from City and connect to water tower. Reconnect existing service lines.
Posted Date
Nov 16, 2025
Due Date
Jan 15, 2026
Release: Nov 16, 2025
Close: Jan 15, 2026
Removal of existing asphalt and existing concrete sidewalks and gutters in pipeline and service line paths. All removed materials will be replaced to match existing, Installation of new 12" C900 PVC water pipeline with all the valves and fittings, Installation of new 6" C900 PVC water pipeline with all the valves and fittings. Removal and replacement of existing fire hydrants. Clean, disinfect, and pressure test new water pipelines. Installation of a new altitude and pressure relief valve vault at the water tower and connect to waterline coming from City and connect to water tower. Reconnect existing service lines.
AvailableConstruction of ~7,000 ft of 8-inch HDPE waterline in Jensen, UT including tie‑ins to existing mains and service lines, installation of fire hydrants, gate valves, and air‑vac valves. Unit-price construction bid; owner estimate ~$675,000. Mandatory pre-bid conference required; project is tied to one other project and bidders must bid both. 5% bid security (bond) required. Substantial completion scheduled by Nov 15, 2026.
Posted Date
Dec 2, 2025
Due Date
Dec 22, 2025
Release: Dec 2, 2025
Close: Dec 22, 2025
Construction of ~7,000 ft of 8-inch HDPE waterline in Jensen, UT including tie‑ins to existing mains and service lines, installation of fire hydrants, gate valves, and air‑vac valves. Unit-price construction bid; owner estimate ~$675,000. Mandatory pre-bid conference required; project is tied to one other project and bidders must bid both. 5% bid security (bond) required. Substantial completion scheduled by Nov 15, 2026.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis