Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes interior and exterior renovations of an existing 7,588 sf administration building; new plumbing, mechanical and electrical systems; new site work and landscaping; existing building is a single story, wood framed structure designed and constructed +/- 1973; partial demo completed (phase i) prior to release of this project to perform prelim demo and clean-up / hazardous material removal.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The State of North Carolina seeks contractors to perform selective demolition, including hazardous material removal and dismantling of building systems, as Phase 1 of the Constable Laboratory building renovation. The work will be performed at 4000 Reedy Creek Road in Raleigh, NC, and must be completed to facilitate future renovation phases while the building is unoccupied. The solicitation is issued via the State Construction Office and is currently open with a response deadline of February 19, 2026.
Posted Date
Jan 23, 2026
Due Date
Feb 19, 2026
Release: Jan 23, 2026
Close: Feb 19, 2026
The State of North Carolina seeks contractors to perform selective demolition, including hazardous material removal and dismantling of building systems, as Phase 1 of the Constable Laboratory building renovation. The work will be performed at 4000 Reedy Creek Road in Raleigh, NC, and must be completed to facilitate future renovation phases while the building is unoccupied. The solicitation is issued via the State Construction Office and is currently open with a response deadline of February 19, 2026.
AvailableReplace fan coil units, building 80, phase ii - HVAC.
Posted Date
Jan 9, 2026
Due Date
Feb 4, 2026
Release: Jan 9, 2026
Close: Feb 4, 2026
Replace fan coil units, building 80, phase ii - HVAC.
AvailableRemodeling of portions of the interior and exterior of the light rail training center (LRTC) building. The scope of the phase 2 project is as follows: remodel the east half of the building, including adding additional restrooms, training rooms, exits, and other support spaces, including all architectural, structural, mechanical and electrical work required. Provide and install windows on the south side of the building. Provide finishes to the east half of the building. Remodel select areas of the west half of the building as indicated on the drawings. Repair the exterior façade and paint. Add parking lot on the west side of the site and update stormwater access. Add the parking along the road between the balloon tracks. Add/modify sidewalks and paved areas around the existing building. Update parking in front of the building for accessibility. Extend and expand the existing HVAC system including ductwork and adding an additional mechanical unit. Extend power, data, and life safety systems into the remodeled areas of the building. Contaminated soil removal in the area of the parking lot as defined in the attached limited phase II drilling investigation.
Posted Date
Jul 15, 2025
Due Date
Jan 29, 2026
Release: Jul 15, 2025
Provide Gym Building and Cafeteria Building Roof and Soffit Replacement Project - Phase II.
Posted Date
-
Due Date
Feb 18, 2026
Close: Feb 18, 2026
Provide Gym Building and Cafeteria Building Roof and Soffit Replacement Project - Phase II.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Jan 29, 2026
Remodeling of portions of the interior and exterior of the light rail training center (LRTC) building. The scope of the phase 2 project is as follows: remodel the east half of the building, including adding additional restrooms, training rooms, exits, and other support spaces, including all architectural, structural, mechanical and electrical work required. Provide and install windows on the south side of the building. Provide finishes to the east half of the building. Remodel select areas of the west half of the building as indicated on the drawings. Repair the exterior façade and paint. Add parking lot on the west side of the site and update stormwater access. Add the parking along the road between the balloon tracks. Add/modify sidewalks and paved areas around the existing building. Update parking in front of the building for accessibility. Extend and expand the existing HVAC system including ductwork and adding an additional mechanical unit. Extend power, data, and life safety systems into the remodeled areas of the building. Contaminated soil removal in the area of the parking lot as defined in the attached limited phase II drilling investigation.
Available