Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
New York State Energy Research and Development Authority
The program provides incentives that reduce the cost of purchasing and installing eligible level 2 charging equipment installed within state that provide charging at a public facility within a disadvantaged community (dac), workplace, or at a multi-unit dwelling (mud).
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
New York State Energy Research and Development Authority
Establishes a list of Level 2 electric vehicle (EV) charging equipment and networks that will be eligible for incentives under the upcoming Charge Ready NY 2.0 Program. Under the Program, interested applicants will be able to receive incentives for the installation of eligible charging equipment. Charging station vendors will submit applications to determine eligibility of one or more models of charging equipment.
Posted Date
Mar 2, 2023
Due Date
Dec 31, 2025
Release: Mar 2, 2023
New York State Energy Research and Development Authority
Close: Dec 31, 2025
Establishes a list of Level 2 electric vehicle (EV) charging equipment and networks that will be eligible for incentives under the upcoming Charge Ready NY 2.0 Program. Under the Program, interested applicants will be able to receive incentives for the installation of eligible charging equipment. Charging station vendors will submit applications to determine eligibility of one or more models of charging equipment.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
New York State Energy Research and Development Authority
Performance-based incentives for the installation of new grid-connected solar photovoltaic (PV) systems greater than 200 kw that offset the use of grid-supplied electricity. PV systems must be sized primarily to serve project load.
Posted Date
May 9, 2015
Due Date
Dec 31, 2030
Release: May 9, 2015
New York State Energy Research and Development Authority
Close: Dec 31, 2030
Performance-based incentives for the installation of new grid-connected solar photovoltaic (PV) systems greater than 200 kw that offset the use of grid-supplied electricity. PV systems must be sized primarily to serve project load.
AvailableLos Angeles Department of Water and Power
The Los Angeles Department of Water and Power (LADWP) is soliciting proposals to modernize Units 1 and 2 at the Scattergood Generating Station to be green hydrogen-ready. Bidders must submit proposals electronically through LADWP’s eRSP system and the bid due date is January 23, 2026.
Posted Date
-
Due Date
Jan 23, 2026
Los Angeles Department of Water and Power
Close: Jan 23, 2026
The Los Angeles Department of Water and Power (LADWP) is soliciting proposals to modernize Units 1 and 2 at the Scattergood Generating Station to be green hydrogen-ready. Bidders must submit proposals electronically through LADWP’s eRSP system and the bid due date is January 23, 2026.
AvailableOttawa County
Supply of ready-mix concrete.
Posted Date
Nov 7, 2025
Due Date
Dec 15, 2025
Release: Nov 7, 2025
Ottawa County
Close: Dec 15, 2025
Supply of ready-mix concrete.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →