Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Works include approx. 100 LF of 8" Sanitary Sewer Line Under CMU Fence (Bore); 160 SF Remove and Repair Concrete Driveway; 2,250 SF Remove and Repair of Asphalt Drive; 485 LF of Trench Safety Implementation; 1,705 LF of 8-inch PVC Sanitary Sewer Line.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Works include approx. 100 LF of 8" Sanitary Sewer Line Under CMU Fence (Bore); 160 SF Remove and Repair Concrete Driveway; 2,250 SF Remove and Repair of Asphalt Drive; 485 LF of Trench Safety Implementation; 1,705 LF of 8-inch PVC Sanitary Sewer Line.
Posted Date
Jan 22, 2026
Due Date
Feb 11, 2026
Release: Jan 22, 2026
Close: Feb 11, 2026
Works include approx. 100 LF of 8" Sanitary Sewer Line Under CMU Fence (Bore); 160 SF Remove and Repair Concrete Driveway; 2,250 SF Remove and Repair of Asphalt Drive; 485 LF of Trench Safety Implementation; 1,705 LF of 8-inch PVC Sanitary Sewer Line.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 3,245 LF furnish and install pvc water main (open cut), 8" pvc; 1 EA furnish and install tapping sleeve with tapping valve and valve box , 6" x 6"; 1 EA furnish and install tapping sleeve with tapping valve and valve box , 8" x 8"; 7 EA furnish and install gate valve and valve box, 8"; 1 ea furnish and install line stops, 8"; 1 EA furnish and install line stops, 6"; 1 EA furnish and install line stops, 2"; 1 EA furnish and install ductile iron pipe fittings for water main, 2" sleeve; 1 EA furnish and install ductile iron pipe fittings for water main, 2" plug; 1 EA furnish and install ductile iron pipe fittings for water main, 6" plug. See outside link.
Posted Date
Jan 15, 2026
Due Date
Feb 12, 2026
Release: Jan 15, 2026
Close: Feb 12, 2026
Work includes 3,245 LF furnish and install pvc water main (open cut), 8" pvc; 1 EA furnish and install tapping sleeve with tapping valve and valve box , 6" x 6"; 1 EA furnish and install tapping sleeve with tapping valve and valve box , 8" x 8"; 7 EA furnish and install gate valve and valve box, 8"; 1 ea furnish and install line stops, 8"; 1 EA furnish and install line stops, 6"; 1 EA furnish and install line stops, 2"; 1 EA furnish and install ductile iron pipe fittings for water main, 2" sleeve; 1 EA furnish and install ductile iron pipe fittings for water main, 2" plug; 1 EA furnish and install ductile iron pipe fittings for water main, 6" plug. See outside link.
AvailableDouglas County, Oregon is soliciting bids for construction services to improve water and sewer infrastructure along Lighthouse Road (County Road #87) in the Winchester Bay area. The solicitation outlines bid submission requirements and provides a deadline for questions and addenda notifications. Bids are due on February 11, 2026 at 8:30 AM local time, with the posting published on January 13, 2026.
Posted Date
Jan 13, 2026
Due Date
Feb 11, 2026
Release: Jan 13, 2026
Close: Feb 11, 2026
Douglas County, Oregon is soliciting bids for construction services to improve water and sewer infrastructure along Lighthouse Road (County Road #87) in the Winchester Bay area. The solicitation outlines bid submission requirements and provides a deadline for questions and addenda notifications. Bids are due on February 11, 2026 at 8:30 AM local time, with the posting published on January 13, 2026.
AvailableWork include Approx. 215 LF of 8" water line and all appurtenances; Approx. 2,460 LF of 8" sanitary sewer pipe and all appurtenances; Approx. 3,670 LF of 24" through 54" storm sewer pipe and all appurtenances.
Posted Date
-
Due Date
Feb 9, 2026
Release: -
Close: Feb 9, 2026
Work include Approx. 215 LF of 8" water line and all appurtenances; Approx. 2,460 LF of 8" sanitary sewer pipe and all appurtenances; Approx. 3,670 LF of 24" through 54" storm sewer pipe and all appurtenances.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →