Town of Flora
The project consist of approx 1,062 LF 12" SDR 26 class 160 PVC gravity sewer main via open cut; 884 LF 12" DIP; 382 LF 14" DIP; 6 EA 48" precast concrete sewer manhole and casting; 2,639 LF pressure test; 30 LF asphalt street and driveway repairs; 2,564 LF cleanup, grassing and erosion control. See outside link.
City of Shaw
Construction of sewer system improvements. The project consists of the following approximate items/quantities: 1,200 feet of 8" 12" gravity sewer line replacement; 13-48" manhole replacement; gravity sewer line point repairs; post treatment aeration; flow monitoring equipment; lagoon levee rip rap stabilization; miscellaneous electrical work; miscellaneous resurfacing & appurtenances.
Town of Ethel
Work includes Replacement of valves in outlet structure; Rehabilitation of a pump station; Sewer system rehabilitation with cleaning, video inspection, point repairs, cured-inplace pipe, manhole rehabilitation, and miscellaneous work .
Town of Plantersville
Sewer system improvements. Work consists of: 1,150 tons of stone riprap (200 lbs) lagoon levee stabilization, 701' of 10" gravity sewer line, 1,237' of 8" gravity sewer line, 13 manholes, 600' of 4" service line, service connections, open-cut and bored steel encasements, bituminous resurfacing, and any additional miscellaneous appurtenances.
Alaska Area Native Health Service
The project includes Phase 1 - Lift Station work, and the first 10 LF of the force main: Rehabilitate existing lift station wet well and Appurtenances. See sheet C-106, Rehabilitate existing lift station building wall paneling, weather stripping, and electrical. See architectural, structural, mechanical, and electrical sheets, Construct addition to lift station for new valve vault. See structural & architectural sheets, Install new wet well pumps, monitoring system, electrical instrumentation, and appurtenances, Construct new arctic pipe force main with force main cleanouts, abandon existing force main in place. Phase 2 - Construction of the septic system, force main, and abandoning of the existing septic system and force main: Construct new community septic tanks and mounded drainage fields, Replace existing sewer collection system components including manholes, main, service connections, Abandon existing community septic tanks and drainfield. Phase 3 - Additive Alternate: Sewer Main and Manhole Repairs: Flush gravity mains to remove all debris. Inspect gravity sewer mains and manholes specified herein, Install new manhole liners, dust pans, and repair cracking and spalling.