Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes apprx 150 LF of 6" ductile iron ansi class 53 water main, boltless-restrained joints and fittings; 32 SF 4" concrete walk; 7.1111 SF repair seeding and mulching.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Install approx. 650 L of new 8" C900 waterline to replace an existing water main within and to the east of Seventh Avenue. Reconnect and replace existing water services and traffic control.
Posted Date
Dec 2, 2025
Due Date
Dec 16, 2025
Release: Dec 2, 2025
Close: Dec 16, 2025
Install approx. 650 L of new 8" C900 waterline to replace an existing water main within and to the east of Seventh Avenue. Reconnect and replace existing water services and traffic control.
AvailablePremium
Access the largest public sector contact database
Waterline replacement.
Posted Date
Nov 5, 2025
Due Date
Dec 17, 2025
Release: Nov 5, 2025
Close: Dec 17, 2025
Waterline replacement.
AvailableConstruction of the waterline replacement project.
Posted Date
Dec 5, 2025
Due Date
Dec 30, 2025
Release: Dec 5, 2025
Close: Dec 30, 2025
Construction of the waterline replacement project.
AvailableContract a consists of the installation of approx., 2,050 LF of 6" C900 PVC DR14 waterline and appurtenances including valves, fire hydrant installation, water service line re-connections, and all temporary and permanent surface restoration including lawn, concrete sidewalk, and all necessary appurtenances and restoration for said construction. Contract b consists of roadway surface restoration and paving. The work includes milling of 3,500 SY of existing pavement, placement of 150 TN of 3/4" scratch, paving of 3,500 SY of 9.5mm wearing course (1. 5" depth), base repair, and all necessary traffic control and driveway access, and all necessary appurtenances and restoration for said construction.
Posted Date
Oct 7, 2025
Due Date
Jan 8, 2026
Release: Oct 7, 2025
Close: Jan 8, 2026
Contract a consists of the installation of approx., 2,050 LF of 6" C900 PVC DR14 waterline and appurtenances including valves, fire hydrant installation, water service line re-connections, and all temporary and permanent surface restoration including lawn, concrete sidewalk, and all necessary appurtenances and restoration for said construction. Contract b consists of roadway surface restoration and paving. The work includes milling of 3,500 SY of existing pavement, placement of 150 TN of 3/4" scratch, paving of 3,500 SY of 9.5mm wearing course (1. 5" depth), base repair, and all necessary traffic control and driveway access, and all necessary appurtenances and restoration for said construction.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis