Summary
CDBG home repair requiring LBP abatement. Repair the six +/- electrical boxes to bring the switch/receptacle to the surface of the new sheetrock and supply/install covers; Install new 10 yr. battery alarms to meet NYS building code; Shower stall - Remove all the old caulking around the bottom, clean the tile and the shower base with a good quality cleaner. Caulk the inside (base to wall) and outside (base to floor) with a high grade mold resistant product; Demo the existing 36” entrance doors and the storm doors on each end of the house; Foundation – Build in all the home made window openings with in kind materials. See outside link.