Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project consists of removal and replacement of borough sidewalks and/or the removal of trees and stumps.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The project consists of removal and replacement of Borough sidewalks and/or the removal of trees and stumps.
Posted Date
Dec 10, 2025
Due Date
Jan 13, 2026
Release: Dec 10, 2025
Close: Jan 13, 2026
The project consists of removal and replacement of Borough sidewalks and/or the removal of trees and stumps.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construct a sidewalk. The sidewalk, crosswalk, and pedestrian ramps shall adhere to current ADA standards. Clearing, grubbing, and grading, utility relocation, concrete sidewalk 4" 3,000 psi, detectable crosswalk warning material, inlet protection systems, crosswalk ramps (ada ramps), driveway adjustments.
Posted Date
Dec 22, 2025
Due Date
Jan 22, 2026
Release: Dec 22, 2025
Close: Jan 22, 2026
Construct a sidewalk. The sidewalk, crosswalk, and pedestrian ramps shall adhere to current ADA standards. Clearing, grubbing, and grading, utility relocation, concrete sidewalk 4" 3,000 psi, detectable crosswalk warning material, inlet protection systems, crosswalk ramps (ada ramps), driveway adjustments.
AvailableRelease: Dec 22, 2025
Close: Jan 26, 2026
Sidewalk replacement.
AvailableThe City of Okanogan seeks a consulting firm for civil engineering design, including preliminary engineering, environmental documentation, permitting, and right-of-way planning, for the Second Avenue (SR 215) Sidewalk Replacement Project.
Posted Date
Dec 24, 2025
Due Date
Jan 22, 2026
Release: Dec 24, 2025
Close: Jan 22, 2026
The City of Okanogan seeks a consulting firm for civil engineering design, including preliminary engineering, environmental documentation, permitting, and right-of-way planning, for the Second Avenue (SR 215) Sidewalk Replacement Project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →