Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consist of Ethernet cabling infrastructure project. Install CAT6A drops excluding Wing 300.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work include cabling infrastructure for E-Rate YR 2026.
Posted Date
Oct 31, 2025
Due Date
Dec 18, 2025
Release: Oct 31, 2025
Close: Dec 18, 2025
Work include cabling infrastructure for E-Rate YR 2026.
AvailablePremium
Access the largest public sector contact database
Fiber-optic cabling infrastructure. Replace existing fiber home runs from MDF to IDFs and, where necessary, replace or repair fiber ends, connectors, and related termination components to ensure full functionality and compliance with applicable standards.
Posted Date
Oct 10, 2025
Due Date
Jan 6, 2026
Release: Oct 10, 2025
Close: Jan 6, 2026
Fiber-optic cabling infrastructure. Replace existing fiber home runs from MDF to IDFs and, where necessary, replace or repair fiber ends, connectors, and related termination components to ensure full functionality and compliance with applicable standards.
AvailableScope shall include cable (fiber optic and twisted-pair copper), fiber interconnect equipment (breakout boxes etc. ), connectors (fiber and copper), jumpers (fiber and copper, patch panel or fiber breakout box to electronics), surface mount raceway, wiring blocks, and telecommunications outlets and any other equipment (except electronics). In addition to material and equipment, the contractor shall provide labor and any incidental material required for installation. All fiber strands shall be terminated with connectors and landed on the fiber interconnect equipment. All copper station cables shall be terminated on patch panels (idf end) and data communications outlets (workstation end); etc, see attached file.
Posted Date
Dec 5, 2025
Due Date
Jan 20, 2026
Release: Dec 5, 2025
Close: Jan 20, 2026
Scope shall include cable (fiber optic and twisted-pair copper), fiber interconnect equipment (breakout boxes etc. ), connectors (fiber and copper), jumpers (fiber and copper, patch panel or fiber breakout box to electronics), surface mount raceway, wiring blocks, and telecommunications outlets and any other equipment (except electronics). In addition to material and equipment, the contractor shall provide labor and any incidental material required for installation. All fiber strands shall be terminated with connectors and landed on the fiber interconnect equipment. All copper station cables shall be terminated on patch panels (idf end) and data communications outlets (workstation end); etc, see attached file.
AvailableCabling Services.
Posted Date
Dec 8, 2025
Due Date
Feb 10, 2026
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis