Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Cabling Services.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Seeking a contract for turn-key, installation of network cabling and corresponding cabling plant infrastructure/services and corresponding required components such as but not limited to patch panels, patch cables, cable trays, conduit, required racks, re-routing/re-termination services, cable management, etc.
Posted Date
Nov 21, 2025
Due Date
Dec 12, 2025
Release: Nov 21, 2025
Close: Dec 12, 2025
Seeking a contract for turn-key, installation of network cabling and corresponding cabling plant infrastructure/services and corresponding required components such as but not limited to patch panels, patch cables, cable trays, conduit, required racks, re-routing/re-termination services, cable management, etc.
Premium
Access the largest public sector contact database
Work consist of Ethernet cabling infrastructure project. Install CAT6A drops excluding Wing 300.
Posted Date
Oct 10, 2025
Due Date
Jan 6, 2026
Release: Oct 10, 2025
Close: Jan 6, 2026
Work consist of Ethernet cabling infrastructure project. Install CAT6A drops excluding Wing 300.
AvailableWork consists of installation and replacement of structured cabling and server racks.
Posted Date
Nov 6, 2025
Due Date
Jan 16, 2026
Release: Nov 6, 2025
Close: Jan 16, 2026
Work consists of installation and replacement of structured cabling and server racks.
AvailableProviding compliant data network cabling (structured cabling system) to enhance classroom connectivity. Installation of Category 6A 4-pair PVC Jacketed shielded (minimum) (ANSI/TIA/EIA 568 B.2-1 & ISO/IEC 11801 Ed. 2.0) plenum (NFPA 262) cabling for data locations, 59 drops at the Academy, 44 drops at the Central School. Cable color (blue) and jack color (blue) coordinated with the District. Provide new data grade wiring from IDF/MDFs to designated classrooms. ermination of data cables at provided network patch panel. The District will provide rack space and required patch panels. Each cable will be terminated at the DCT end in an RJ45 keystone jack (Category 6A shielded (metal) pass-through or toolless type) and at the Wiring Closet (IDF or MDF). It will end in a mounted RJ456 network jack hidden ABOVE the ceiling tiles in each classroom. These will be used to connect ceiling access points to the data network.
Posted Date
-
Due Date
Dec 12, 2025
Release: -
Close: Dec 12, 2025
Providing compliant data network cabling (structured cabling system) to enhance classroom connectivity. Installation of Category 6A 4-pair PVC Jacketed shielded (minimum) (ANSI/TIA/EIA 568 B.2-1 & ISO/IEC 11801 Ed. 2.0) plenum (NFPA 262) cabling for data locations, 59 drops at the Academy, 44 drops at the Central School. Cable color (blue) and jack color (blue) coordinated with the District. Provide new data grade wiring from IDF/MDFs to designated classrooms. ermination of data cables at provided network patch panel. The District will provide rack space and required patch panels. Each cable will be terminated at the DCT end in an RJ45 keystone jack (Category 6A shielded (metal) pass-through or toolless type) and at the Wiring Closet (IDF or MDF). It will end in a mounted RJ456 network jack hidden ABOVE the ceiling tiles in each classroom. These will be used to connect ceiling access points to the data network.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis