Summary
Project consists of approx. Mobilization/demobilization; clearing and grubbing; water control; demolition; inverted siphon inlet transition structure; inverted siphon outlet transition structure; inverted siphon pipe 162 LF; inverted siphon transition structure walkway with removeable handrail 2 EA; inverted siphon trash rack; concrete fishway, diversion, and screen box; diversion walkway with removeable handrail; screen box walkway with removeable handrail; fish screen and brush trolley wiper; three-pipe aluminum railing 410 LF; winter drain slide gate; 30-inch slide gate 2 EA; 14-inch slide gate 2 EA; 12-inch slide gate 2 EA; 8-inch slide gate1 EA. See attached file.