Summary
Project consists of a comprehensive renovation of the existing capizzo stadium on the campus of the nantucket public schools. Proposed improvements include but are not limited to: 400-meter running track; multi-sport synthetic turf field; 980-seat grandstand and press box; 17-space parking lot; concessions/boosters/restroom support building; team/officials/storage/restroom building; segmental block retaining walls; cast-in-place concrete retaining walls; sanitary, water, electrical, communications, stormwater utility infrastructure and connections; site security cameras; chain link fencing and gates; planting and restoration.