Summary
The work to be performed under this contract generally consists of the construction of water system improvements. The work to be performed generally consists of potable water main improvements including the installation of new main, gate valves, tees, bends, thrust/anchor blocks, and fittings; installation of fire hydrant and blow-off assembly; installation of water service lines, meters (city furnished), and boxes; and other associated facilities; clearing and grubbing; traffic control; trenching; trench plating; shoring; pressure/bacteriological testing; backfilling and compaction; asphalt concrete (ac) pavement reconstruction. See attached file.