Summary
Work consist of sitework, 50 TN of installation of rip rap, 56 CY of rock excavation, 3,200 SF of paving, sewer pump station construction, installation of electrical conduit and wiring, relocation and modification of existing control systems, panels and junction boxes, lighting, instrumentation and other work related to the installation, operation, and remote SCADA monitoring of the pump station facility, demolition and/or abandonment of existing building, paving, electrical controls, wet well, sewer, water, storm water piping, and valve vault, construction of a new hydropneumatic tank, tying into existing piping, and concrete equipment slab, landscaping / misc. Piping / painting and signage / equipment startup and testing.