Summary
Work consist of 8,300 lf of furnish and install 8-inch pvc c900 water main pipe, 760 lf of furnish and install 8-inch sdr 11 water main pipe by pipe bursting, 1 ea of cut and connect to ex. Water main with cut in tee, sleeves and spool pieces, 100 lf of restrain existing water main/force main, 32 ea of furnish and install 8-inch mj gate valve, 24 ea of furnish and install 1-inch automatic air release valve, 8,600 lb of furnish and install fittings, 15 ea of furnish and install new water meter box, 18 ea of furnish and install 1-inch same side single water service, 18 ea of furnish and install 1-inch road crossing single water service. See attached file.