Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This project consists of the drilling and completion of completion of a 570 foot deep public water supply well. the installation of a well pump and related equipment, the construction of a new well building with chemical feed, controls and telemetry and site work at well location site, the installation of approx. 1,650 FT 4" diameter C900 transmission pipeline from the new well building to a new water treatment building, the construction of a new water treatment building with filters, controls, backwash system telemetry equipment at a remote tank site and one existing well site.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Project will include construction of a new treatment building, a new arsenic treatment system; construction of water lines and connections to the existing well house piping; construction of concrete drying beds and an unlined infiltration basin; and installation of electrical equipment and controls upgrades.
Posted Date
Jan 18, 2026
Due Date
Feb 26, 2026
Release: Jan 18, 2026
Close: Feb 26, 2026
Project will include construction of a new treatment building, a new arsenic treatment system; construction of water lines and connections to the existing well house piping; construction of concrete drying beds and an unlined infiltration basin; and installation of electrical equipment and controls upgrades.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This project involves the drilling and completion of a 570-foot public water supply well, installation of a well pump and related equipment, construction of a new well building, installation of approximately 1650-feet of 6-inch diameter transmission pipeline, construction of a new water treatment building with filters and controls, a new 16,000-gallon bolted steel backwash tank, and installation of telemetry equipment.
Posted Date
Jan 16, 2026
Due Date
Feb 19, 2026
Release: Jan 16, 2026
Close: Feb 19, 2026
This project involves the drilling and completion of a 570-foot public water supply well, installation of a well pump and related equipment, construction of a new well building, installation of approximately 1650-feet of 6-inch diameter transmission pipeline, construction of a new water treatment building with filters and controls, a new 16,000-gallon bolted steel backwash tank, and installation of telemetry equipment.
AvailableThe City of Lockport will receive sealed bids for Well 6 and Well 13 Treatment Plants Rehabilitation, Removal and Replacement of Iron Filter Media, Removal and Reinstallation of New Face Piping for Iron Removal Filter System, Removal and Replacement of Chlorine Gas Piping, Pump, Storage, and Scales, Removal and Replacement of Motor Control Center and Motor Variable Frequency Drives, Removal and Replacement of Supervisory Control and Data Acquisition System Components, and all incidental and collateral work necessary to complete the projec
Posted Date
Jan 27, 2026
Due Date
Feb 18, 2026
Release: Jan 27, 2026
Close: Feb 18, 2026
The City of Lockport will receive sealed bids for Well 6 and Well 13 Treatment Plants Rehabilitation, Removal and Replacement of Iron Filter Media, Removal and Reinstallation of New Face Piping for Iron Removal Filter System, Removal and Replacement of Chlorine Gas Piping, Pump, Storage, and Scales, Removal and Replacement of Motor Control Center and Motor Variable Frequency Drives, Removal and Replacement of Supervisory Control and Data Acquisition System Components, and all incidental and collateral work necessary to complete the projec
AvailableProvide construction services for well no. 3 at water treatment facility #2.
Posted Date
Dec 29, 2025
Due Date
Jan 30, 2026
Release: Dec 29, 2025
Close: Jan 30, 2026
Provide construction services for well no. 3 at water treatment facility #2.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →