Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists generally of the construction of a new sigle story, 11,657 SF fire rescue station and all related site improvements. Work include, without limitation: construction materials testing, field surveying services, site work, septic tank and drain field system, fencing and gates, landscaping, irrigation, concrete, masonry, pre-cast concrete, polished concrete floors, miscellaneous structural steel, wood roof trusses, rough carpentry, cabinetry and countertops, insulation, metal roofing, joint sealants, doors, frames, finish hardware, overhead sectional doors, aluminum storefront entrances, aluminum storefront windows, framing, drywall, stucco, acoustical ceiling systems, flooring and base, tile flooring, rubberized athletic flooring.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Invitation for Bids (IFB) for replacement of the roof at Fire Rescue Station 35 in Palm Beach County, FL. The solicitation (IFB-410-P-2025-000066-1) is administered by Facilities Development & Operations and posted on Palm Beach County’s vendor portal; interested bidders must retrieve documents via the county VSS.
Posted Date
Dec 4, 2025
Due Date
Jan 15, 2026
Release: Dec 4, 2025
Close: Jan 15, 2026
Invitation for Bids (IFB) for replacement of the roof at Fire Rescue Station 35 in Palm Beach County, FL. The solicitation (IFB-410-P-2025-000066-1) is administered by Facilities Development & Operations and posted on Palm Beach County’s vendor portal; interested bidders must retrieve documents via the county VSS.
AvailableInvitation for Bids (IFB) for replacement of the roof at Fire Rescue Station 35 in Palm Beach County, FL. The solicitation (IFB-410-P-2025-000066-1) is administered by Facilities Development & Operations and posted on Palm Beach County’s vendor portal; interested bidders must retrieve documents via the county VSS.
Posted Date
Dec 4, 2025
Due Date
Jan 15, 2026
Release: Dec 4, 2025
Close: Jan 15, 2026
Invitation for Bids (IFB) for replacement of the roof at Fire Rescue Station 35 in Palm Beach County, FL. The solicitation (IFB-410-P-2025-000066-1) is administered by Facilities Development & Operations and posted on Palm Beach County’s vendor portal; interested bidders must retrieve documents via the county VSS.
AvailableFire and rescue equipment. Provide competitive pricing for fire and rescue equipment through their retail distribution networks to all participating states and political subdivisions.
Posted Date
Sep 29, 2025
Due Date
Jan 21, 2026
Release: Sep 29, 2025
Close: Jan 21, 2026
Fire and rescue equipment. Provide competitive pricing for fire and rescue equipment through their retail distribution networks to all participating states and political subdivisions.
AvailableProvide construction management at risk (cmar) services for the preconstruction, including the preparation and submission of a guaranteed maximum price (gmp), and construction phase services for a new 20,000-square-foot joint-use fire rescue station. Services shall include but are not limited to constructing a new station, site development, storm water systems, utility service construction and connections, accompanying access entrance drives, surface parking areas, landscaping and any other area needed for the successful completion of the project. Attend and participate in all design progress/review meetings. Participate in all buildings modeling reviews and reporting. See outside link.
Posted Date
-
Due Date
Dec 31, 2025
Close: Dec 31, 2025
Provide construction management at risk (cmar) services for the preconstruction, including the preparation and submission of a guaranteed maximum price (gmp), and construction phase services for a new 20,000-square-foot joint-use fire rescue station. Services shall include but are not limited to constructing a new station, site development, storm water systems, utility service construction and connections, accompanying access entrance drives, surface parking areas, landscaping and any other area needed for the successful completion of the project. Attend and participate in all design progress/review meetings. Participate in all buildings modeling reviews and reporting. See outside link.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis