Wyoming Department of Transportation
State AgencyWY
Aug 12, 2026
Closes
Sep 10, 2026
Call Order 002 -- HI-BFP-B263005 District 3 Bridge Replacement
Works include approx. 12,275 CY unclassified excavation; 200 CY flowable backfill; 10,161 LF of steel piling hp 14x89; 196 LF of 18" rcp; 492 LF of 6" perf underdrain pipe; 22,400 LF of 4" pavement line. Description: 1 LS of mobilization; 1 LS of removal of signs; 1 ea of removal of cattle guards; 7020 ft of removal of guardrail; 3000 ft of removal of fence; 6 ea of removal of concrete bridges; 20000 SY of removal of surfacing; 12275 CY of unclassified excavation; 200 CY of flowable backfill; 529 mg of water; 100 hr or motor grader; 3570 CY of dry excavation; 1 LS of contractor storm water control; 18 SY of geotextile, erosion control; 11700 SY of geotextile, material separation (non-woven); 8649 SY of geotextile, emb and retaining wall; 11700 SY of biaxial geogrid. See attached file.