Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes approx. 61,800 SY of Milling Plant Mix; 39,070 CY of Unclassified Excavation; 500 SF of Thermoplastic Pavement Markings; 360 LF of Sign Post, Wood 6x6 in; 40 EA of Flexible Delineators; 84 SF of Pavement Marking Removal. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Construction contract for street rehabilitation: approximately 9 lane-miles of mill-and-overlay plus associated curb & gutter, ADA ramps, and spot base repairs. Unit-price, measured-quantity contract with locations/quantities adjusted by the City; electronic bid submission via QuestCDN required; mandatory pre-bid conference; bid bond (5%) and 100% performance/payment bonds required; project manual available for $22 download fee.
Posted Date
Nov 22, 2025
Due Date
Jan 13, 2026
Release: Nov 22, 2025
Close: Jan 13, 2026
Construction contract for street rehabilitation: approximately 9 lane-miles of mill-and-overlay plus associated curb & gutter, ADA ramps, and spot base repairs. Unit-price, measured-quantity contract with locations/quantities adjusted by the City; electronic bid submission via QuestCDN required; mandatory pre-bid conference; bid bond (5%) and 100% performance/payment bonds required; project manual available for $22 download fee.
Premium
Access the largest public sector contact database
Project work consists of cured in place pipelining for culverts on US 50 and I-70 at various locations.
Posted Date
Dec 10, 2025
Due Date
Jan 8, 2026
Release: Dec 10, 2025
Close: Jan 8, 2026
Project work consists of cured in place pipelining for culverts on US 50 and I-70 at various locations.
AvailableIDOT is soliciting bids to replace traffic signal mast arms at two intersections along US 45/US 52 in Kankakee County: at River Road and at South Tec Drive. Work includes furnishing and installing new mast arm signal supports and associated signal equipment and incidentals to produce a fully operational signal system. The contract for this item is set at 60 working days and is scheduled for the January 16, 2026 letting.
Posted Date
Nov 18, 2025
Due Date
Jan 16, 2026
Release: Nov 18, 2025
Close: Jan 16, 2026
IDOT is soliciting bids to replace traffic signal mast arms at two intersections along US 45/US 52 in Kankakee County: at River Road and at South Tec Drive. Work includes furnishing and installing new mast arm signal supports and associated signal equipment and incidentals to produce a fully operational signal system. The contract for this item is set at 60 working days and is scheduled for the January 16, 2026 letting.
AvailableThe Illinois Department of Transportation (Region 3, District 5) is seeking bids for a culvert replacement project. This project is located at a ditch 0.4 mile south of US 136 in Heyworth, McLean County, along Old US 51. The scope of work includes culvert replacement, earthwork, pavement patching, HMA shoulders, erosion control, and markings, with a contract duration of 55 working days. This is an active highway construction letting, not a grant, with a due date of January 16, 2026.
Posted Date
Dec 5, 2025
Due Date
Jan 16, 2026
Release: Dec 5, 2025
Close: Jan 16, 2026
The Illinois Department of Transportation (Region 3, District 5) is seeking bids for a culvert replacement project. This project is located at a ditch 0.4 mile south of US 136 in Heyworth, McLean County, along Old US 51. The scope of work includes culvert replacement, earthwork, pavement patching, HMA shoulders, erosion control, and markings, with a contract duration of 55 working days. This is an active highway construction letting, not a grant, with a due date of January 16, 2026.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis