Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Work shall include, but not be limited to, mobilization and demobilization at or to the Project Site, construction surveying, dredging and backfilling of optional temporary flotation channels, excavation and stockpiling of material for backfill, dredging of the inlet and outlet basins, construction of drainage structures, installation of riprap and articulated concrete block mats for shoreline and slope stabilization.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Rehabilitate drainage structures.
Posted Date
-
Due Date
Jan 27, 2026
Close: Jan 27, 2026
Rehabilitate drainage structures.
AvailableFurnish & deliver stormwater pipes & drainage structures (pipes).
Posted Date
Dec 24, 2025
Due Date
Jan 14, 2026
Release: Dec 24, 2025
Close: Jan 14, 2026
Furnish & deliver stormwater pipes & drainage structures (pipes).
AvailableThe RFP titled "Paxton Creek Redevelopment: Conceptual Design For Natural Stream, Bridges, Structures, Hydraulic and Hydrologic Modeling" was issued by the Redevelopment Authority of the City of Harrisburg, Dauphin County, PA. It seeks a Qualified Environmental Professional to provide conceptual stream design, bridge/structure design, hydraulic and hydrologic modeling, and related services, funded by a FEMA grant. The solicitation was posted on Dec. 16, 2025 and bids are due by 5:00 pm on Jan. 30, 2026.
Posted Date
Dec 16, 2025
Due Date
Jan 30, 2026
Release: Dec 16, 2025
Close: Jan 30, 2026
The RFP titled "Paxton Creek Redevelopment: Conceptual Design For Natural Stream, Bridges, Structures, Hydraulic and Hydrologic Modeling" was issued by the Redevelopment Authority of the City of Harrisburg, Dauphin County, PA. It seeks a Qualified Environmental Professional to provide conceptual stream design, bridge/structure design, hydraulic and hydrologic modeling, and related services, funded by a FEMA grant. The solicitation was posted on Dec. 16, 2025 and bids are due by 5:00 pm on Jan. 30, 2026.
Two component polyurethane injection at drainage structures, drainage pipes, box culverts, asphalt and concrete pavement areas, sidewalk areas and bridge approach slabs for the purpose of densification of subgrade, filling voids, sealing drainage structures and realignment of surface.
Posted Date
Dec 22, 2025
Due Date
Jan 21, 2026
Release: Dec 22, 2025
Close: Jan 21, 2026
Two component polyurethane injection at drainage structures, drainage pipes, box culverts, asphalt and concrete pavement areas, sidewalk areas and bridge approach slabs for the purpose of densification of subgrade, filling voids, sealing drainage structures and realignment of surface.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis