Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Two component polyurethane injection at drainage structures, drainage pipes, box culverts, asphalt and concrete pavement areas, sidewalk areas and bridge approach slabs for the purpose of densification of subgrade, filling voids, sealing drainage structures and realignment of surface.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
To perform subsurface pressure grouting and shallow subsurface polyurethane injection. The subsurface pressure grouting program is to improve the subsurface conditions by injecting cement grout to fill voids and densify the soils as noted in a cement grout injection plan to minimize the potential for future ground subsidence. The shallow subsurface polyurethane injection will be used at drainage structures, drainage pipes, box culverts, asphalt and concrete pavement areas, sidewalk areas and bridge approach slabs for the purpose of densification of subgrade, filling voids, sealing drainage structures. And realignment of surface.
Posted Date
Dec 22, 2025
Due Date
Jan 21, 2026
Release: Dec 22, 2025
Close: Jan 21, 2026
To perform subsurface pressure grouting and shallow subsurface polyurethane injection. The subsurface pressure grouting program is to improve the subsurface conditions by injecting cement grout to fill voids and densify the soils as noted in a cement grout injection plan to minimize the potential for future ground subsidence. The shallow subsurface polyurethane injection will be used at drainage structures, drainage pipes, box culverts, asphalt and concrete pavement areas, sidewalk areas and bridge approach slabs for the purpose of densification of subgrade, filling voids, sealing drainage structures. And realignment of surface.
AvailableThe Town of Acton Department of Public Works (Highway) seeks bids to furnish and deliver reinforced concrete stormwater pipes and drainage structures. The opportunity was posted on COMMBUYS on December 24, 2025, with bids due January 14, 2026 at 10:00 AM Eastern. This is a single open-market solicitation for the supply of materials; bidders must follow the instructions and required attachments provided on COMMBUYS.
Posted Date
Dec 24, 2025
Due Date
Jan 14, 2026
Release: Dec 24, 2025
Close: Jan 14, 2026
The Town of Acton Department of Public Works (Highway) seeks bids to furnish and deliver reinforced concrete stormwater pipes and drainage structures. The opportunity was posted on COMMBUYS on December 24, 2025, with bids due January 14, 2026 at 10:00 AM Eastern. This is a single open-market solicitation for the supply of materials; bidders must follow the instructions and required attachments provided on COMMBUYS.
AvailableA Contract consisting of Drainage Cleaning on various Arterial State Roads in County.
Posted Date
Dec 18, 2025
Due Date
Jan 29, 2026
Release: Dec 18, 2025
Close: Jan 29, 2026
A Contract consisting of Drainage Cleaning on various Arterial State Roads in County.
AvailableConstruction of three (3) 16' x 6' reinforced concrete box drainage culverts one (1) 14' x 5' reinforced concrete box drainage culvert one (1) 10' x 4' reinforced concrete box drainage culvert various locations within District 3.
Posted Date
Dec 8, 2025
Due Date
Jan 26, 2026
Release: Dec 8, 2025
Close: Jan 26, 2026
Construction of three (3) 16' x 6' reinforced concrete box drainage culverts one (1) 14' x 5' reinforced concrete box drainage culvert one (1) 10' x 4' reinforced concrete box drainage culvert various locations within District 3.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis