Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Cable, Video Infotainment.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Chapel audio system fiber integration: An output of the existing Chapel audio system will connect to a new network encoder, provided by the contractor, which will terminate to a new wall mount network switch, provided by the contractor, located at the existing fiber termination point within the building. (Technicians will be required to install new CAT6 cable between audio system’s new encoder and fiber termination point for the switch interconnection.) Once wiring and both devices are in place a fiber port on the new network switch will need to be patched to the existing facility fiber within the Chapel building for transmission to building 3 via the existing fiber network. Chapel new video camera and integration: Contractor shall provide and install a new HD PoE network camera to replace the current Chapel video broadcast camera and will integrate with the above network switch via a Cat 6 cable run to the switch located at the fiber termination panel within the building. See attached file.
Posted Date
Nov 25, 2025
Due Date
Dec 18, 2025
Premium
Access the largest public sector contact database
Close: Dec 18, 2025
Chapel audio system fiber integration: An output of the existing Chapel audio system will connect to a new network encoder, provided by the contractor, which will terminate to a new wall mount network switch, provided by the contractor, located at the existing fiber termination point within the building. (Technicians will be required to install new CAT6 cable between audio system’s new encoder and fiber termination point for the switch interconnection.) Once wiring and both devices are in place a fiber port on the new network switch will need to be patched to the existing facility fiber within the Chapel building for transmission to building 3 via the existing fiber network. Chapel new video camera and integration: Contractor shall provide and install a new HD PoE network camera to replace the current Chapel video broadcast camera and will integrate with the above network switch via a Cat 6 cable run to the switch located at the fiber termination panel within the building. See attached file.
AvailableProvide cable replacement. Provide information to identify the cable type, including but not limited to: category 5e, 6, 6a, utp, singlemode, multimode, etc. Cable manufacturer and part number. Identifying all systimax cables. Cable length as reported by the test meter. Cable tr endpoints: identify the serving tr. Identify the rack, patch panel, and port number where each cable terminates. Identify the type of patch panel in the tr the cable is terminated to. Identify the location of the patch panel in the rack, or other location if the patch panel is not located in a rack. Labels shall be applied to all cables covered by this project. Labels shall be applied to all racks, cabinets, and copper patch panels in all telecommunication rooms that are part of this project. See outside link.
Posted Date
Nov 24, 2025
Due Date
Dec 19, 2025
Release: Nov 24, 2025
Close: Dec 19, 2025
Provide cable replacement. Provide information to identify the cable type, including but not limited to: category 5e, 6, 6a, utp, singlemode, multimode, etc. Cable manufacturer and part number. Identifying all systimax cables. Cable length as reported by the test meter. Cable tr endpoints: identify the serving tr. Identify the rack, patch panel, and port number where each cable terminates. Identify the type of patch panel in the tr the cable is terminated to. Identify the location of the patch panel in the rack, or other location if the patch panel is not located in a rack. Labels shall be applied to all cables covered by this project. Labels shall be applied to all racks, cabinets, and copper patch panels in all telecommunication rooms that are part of this project. See outside link.
AvailableProvide video equipment.
Posted Date
Sep 23, 2025
Due Date
Mar 11, 2026
Release: Sep 23, 2025
Close: Mar 11, 2026
Provide video equipment.
AvailableCable Assembly, 6150015559789WF.
Posted Date
Jun 16, 2021
Due Date
Jun 15, 2026
Release: Jun 16, 2021
Close: Jun 15, 2026
Cable Assembly, 6150015559789WF.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis