Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Wichita
Provide cable replacement. Provide information to identify the cable type, including but not limited to: category 5e, 6, 6a, utp, singlemode, multimode, etc. Cable manufacturer and part number. Identifying all systimax cables. Cable length as reported by the test meter. Cable tr endpoints: identify the serving tr. Identify the rack, patch panel, and port number where each cable terminates. Identify the type of patch panel in the tr the cable is terminated to. Identify the location of the patch panel in the rack, or other location if the patch panel is not located in a rack. Labels shall be applied to all cables covered by this project. Labels shall be applied to all racks, cabinets, and copper patch panels in all telecommunication rooms that are part of this project. See outside link.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Naval Supply Systems Command (NAVSUP)
Cable assembly,cia, - and other replacement parts, in repair/modification of NSN 7R-2840-015911512-SX, TDP VER 004, QTY 5 Ea
Posted Date
Sep 24, 2025
Due Date
Dec 15, 2025
Release: Sep 24, 2025
Naval Supply Systems Command (NAVSUP)
Close: Dec 15, 2025
Cable assembly,cia, - and other replacement parts, in repair/modification of NSN 7R-2840-015911512-SX, TDP VER 004, QTY 5 Ea
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
New York And New Jersey Port Authority
Provide professional electrical cable testing and analysis services as requested on a "call-in" basis during 2022 through 2025.
Posted Date
Nov 17, 2023
Due Date
Dec 31, 2025
Release: Nov 17, 2023
New York And New Jersey Port Authority
Close: Dec 31, 2025
Provide professional electrical cable testing and analysis services as requested on a "call-in" basis during 2022 through 2025.
AvailableBroward County
Scope includes the furnishing of all labor, materials, equipment, and services for the replacement of 5KV power cables on two ship-to-shore container cranes sp3 and sp7. Work shall be performed at port everglades southport terminal, on cranes identified as SP-3, and SP-7. The scope of work includes the removal of the existing 5kv power cable, installation of the new cable, termination of all conductors and fiber optics, followed by testing, and commissioning. 9.2 all removal, preparation and installation activities shall be performed in strict accordance with the manufacturer s instructions. In the event of a conflict between the manufacturer s instructions and other requirements. See attached file for full scope.
Posted Date
Nov 5, 2025
Due Date
Dec 8, 2025
Release: Nov 5, 2025
Broward County
Close: Dec 8, 2025
Scope includes the furnishing of all labor, materials, equipment, and services for the replacement of 5KV power cables on two ship-to-shore container cranes sp3 and sp7. Work shall be performed at port everglades southport terminal, on cranes identified as SP-3, and SP-7. The scope of work includes the removal of the existing 5kv power cable, installation of the new cable, termination of all conductors and fiber optics, followed by testing, and commissioning. 9.2 all removal, preparation and installation activities shall be performed in strict accordance with the manufacturer s instructions. In the event of a conflict between the manufacturer s instructions and other requirements. See attached file for full scope.
AvailableJacksonville Electric Authority (JEA) - Procurement Dept
Work includes construction and commissioning of twelve high pressure fluid filled (hpff) 115kv pipe-type cable terminations at substation.
Posted Date
Nov 5, 2025
Due Date
Dec 9, 2025
Release: Nov 5, 2025
Jacksonville Electric Authority (JEA) - Procurement Dept
Close: Dec 9, 2025
Work includes construction and commissioning of twelve high pressure fluid filled (hpff) 115kv pipe-type cable terminations at substation.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →