Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Lump sum ls mobilization; lump sum ls construction surveying; lump sum ls grading; 1 acr supplementary clearing & grubbing; 850 cy undercut excavation; 210 cy drainage ditch excavation; 800 cy select granular material; 1,500 sy geotextile for soil stabilization; 15,500 sf temporary shoring; 50 ton generic grading item; hauling and disposal of petroleum contaminated soil; 2,180 ton foundation conditioning material, minor structures; 6,860 sy foundation conditioning geotextile; 124 lf 24" drainage pipe; 52 lf ****" rc pipe culverts, class iv (12"). See attached file for full scope.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Lump sum ls mobilization; lump sum ls construction surveying; lump sum ls clearing & grubbing. . Acre(s); 2 acr supplementary clearing & grubbing; 38,200 cy unclassified excavation; 9,265 cy undercut excavation; 5,200 cy borrow excavation; 75 cy drainage ditch excavation; 1,510 sy removal of existing asphalt pavement; 140 sy removal of existing concrete pavement; 10 hr proof rolling; 200 cy select granular material, class iii; 1,500 sy geotextile for soil stabilization; 930 ton foundation conditioning material, minor structures; 2,920 sy foundation conditioning geotextile; 208 lf 15" drainage pipe. See attached file for full scope.
Posted Date
Dec 23, 2025
Due Date
Jan 20, 2026
Release: Dec 23, 2025
Close: Jan 20, 2026
Lump sum ls mobilization; lump sum ls construction surveying; lump sum ls clearing & grubbing. . Acre(s); 2 acr supplementary clearing & grubbing; 38,200 cy unclassified excavation; 9,265 cy undercut excavation; 5,200 cy borrow excavation; 75 cy drainage ditch excavation; 1,510 sy removal of existing asphalt pavement; 140 sy removal of existing concrete pavement; 10 hr proof rolling; 200 cy select granular material, class iii; 1,500 sy geotextile for soil stabilization; 930 ton foundation conditioning material, minor structures; 2,920 sy foundation conditioning geotextile; 208 lf 15" drainage pipe. See attached file for full scope.
AvailableLump sum ls generic miscellaneous item vibration monitoring; 1 acr supplementary clearing & grubbing; 400 cy undercut excavation; lump sum ls grading; 4,700 cy borrow excavation; 400 cy select granular material; 400 sy geotextile for soil stabilization; 120 sf temporary shoring; lump sum ls generic grading item type 1 bridge approach fill, station 30+73. 46 -l-; 50 ton generic grading item hauling and disposal of petroleum contaminated soil. See attached file for full scope.
Posted Date
Dec 23, 2025
Due Date
Jan 20, 2026
Release: Dec 23, 2025
Close: Jan 20, 2026
Lump sum ls generic miscellaneous item vibration monitoring; 1 acr supplementary clearing & grubbing; 400 cy undercut excavation; lump sum ls grading; 4,700 cy borrow excavation; 400 cy select granular material; 400 sy geotextile for soil stabilization; 120 sf temporary shoring; lump sum ls generic grading item type 1 bridge approach fill, station 30+73. 46 -l-; 50 ton generic grading item hauling and disposal of petroleum contaminated soil. See attached file for full scope.
Requesting bids for grading, paving, drainage, and structure work on SR 1850 (Wade Stedman Rd), Structure 29 over Buck Creek in Cumberland County.
Posted Date
Dec 30, 2025
Due Date
Jan 21, 2026
Release: Dec 30, 2025
Close: Jan 21, 2026
Requesting bids for grading, paving, drainage, and structure work on SR 1850 (Wade Stedman Rd), Structure 29 over Buck Creek in Cumberland County.
AvailableMobilization; construction surveying; 200 cy, undercut excavation; grading; 1 acr, supplementary clearing & grubbing; 200 cy, select granular material; 200 sy, geotextile for soil stabilization; 2,600 sf, temporary shoring; 20 ton, foundation conditioning material, minor structures; 60 sy, foundation conditioning geotextile. See attached file for full scope.
Posted Date
Jan 5, 2026
Due Date
Jan 27, 2026
Release: Jan 5, 2026
Close: Jan 27, 2026
Mobilization; construction surveying; 200 cy, undercut excavation; grading; 1 acr, supplementary clearing & grubbing; 200 cy, select granular material; 200 sy, geotextile for soil stabilization; 2,600 sf, temporary shoring; 20 ton, foundation conditioning material, minor structures; 60 sy, foundation conditioning geotextile. See attached file for full scope.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis