Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Department of Veterans Affairs (VISN 2) issued a Sources Sought for A-E services to provide full design services to renovate 15 restrooms in Building 76 and replace flooring in the Urgent Care Center at Bath VA Medical Center (Project 528A6-24-608). This procurement is a 100% SDVOSB set-aside under NAICS 541310 with an estimated construction magnitude of $2,000,000 to $5,000,000; firms must submit an electronic SF-330 by the deadline. Responses are due Jan 29, 2026 at 12:00 PM EST, the synopsis was published Dec 29, 2025, and the anticipated award is on or before May 30, 2026.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Renovations of the men's and women's restrooms in the concession stand building and the men's and women's shower rooms in the camping restroom building.
Posted Date
Dec 16, 2025
Due Date
Jan 5, 2026
Release: Dec 16, 2025
Close: Jan 5, 2026
Renovations of the men's and women's restrooms in the concession stand building and the men's and women's shower rooms in the camping restroom building.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Department of Veterans Affairs (VA) seeks Architect/Engineering (A/E) design services to renovate and repair approximately 4,500 +/- SF of Building 28 Ground for SPS at the Lexington VA Health Care System Franklin R. Sousley Campus in Lexington, KY. This presolicitation requests SF-330 qualifications packages from A/E firms; following evaluation, the highest-rated firm will be invited to submit a price proposal under the Brooks Act. The procurement is a Service-Disabled Veteran-Owned Small Business set-aside (NAICS 541330) and includes historic-preservation requirements, HVAC replacement to VAV units, building envelope and wayfinding improvements, and other facility corrections.
Posted Date
Dec 30, 2025
Due Date
Jan 31, 2026
Release: Dec 30, 2025
Close: Jan 31, 2026
The Department of Veterans Affairs (VA) seeks Architect/Engineering (A/E) design services to renovate and repair approximately 4,500 +/- SF of Building 28 Ground for SPS at the Lexington VA Health Care System Franklin R. Sousley Campus in Lexington, KY. This presolicitation requests SF-330 qualifications packages from A/E firms; following evaluation, the highest-rated firm will be invited to submit a price proposal under the Brooks Act. The procurement is a Service-Disabled Veteran-Owned Small Business set-aside (NAICS 541330) and includes historic-preservation requirements, HVAC replacement to VAV units, building envelope and wayfinding improvements, and other facility corrections.
AvailableThis project will renovate seven (7) Men's public restrooms, seven (7) Women’s public restrooms and two (2) Companion Care public restrooms located on the first, second and third floors of the terminal building in both sterile and non-sterile areas. All of the work will be done within the existing footprint of each bathroom and will include demolition of existing finishes with the existing terrazzo floor remaining in place and all plumbing fixtures and finishes to be replaced. The work generally includes: General Construction: The general contractor shall be responsible for taking the lead role for the purpose of coordination between disciplines to ensure the work is completed as shown on the plans and specified. Work for renovation generally includes new drywall ceilings; new acoustical ceiling tile and grid; new moisture-resistant wall board behind all new wall tile; remove and replace damaged metal studs; new tile floor shall be sloped to existing drain locations; new toilet partitions and toilet accessories; new AerDec Sink System and structural supports; new internally illuminated panel system at entry; new counter mounted panel system; Interior painting; new door, frame, and hardware; new signage. Mechanical: Work for renovation generally includes new supply and return air diffusers in accordance with new ACT ceiling and drywall ceilings; Test, balance and commission system, new toilets, flushometers, and faucets. Electrical: Work for renovation generally includes new breakers, conduit and wiring, new receptacles; new dimmable recessed LED light fixtures and occupancy sensors; new AerDec Sink System to include hard-wired deck mounted hand dryer at each lavatory in addition to battery operated faucet and soap dispenser; new automatic paper towel dispensers.
Posted Date
Jun 27, 2025
Due Date
Jan 7, 2026
Release: Jun 27, 2025
Close: Jan 7, 2026
This project will renovate seven (7) Men's public restrooms, seven (7) Women’s public restrooms and two (2) Companion Care public restrooms located on the first, second and third floors of the terminal building in both sterile and non-sterile areas. All of the work will be done within the existing footprint of each bathroom and will include demolition of existing finishes with the existing terrazzo floor remaining in place and all plumbing fixtures and finishes to be replaced. The work generally includes: General Construction: The general contractor shall be responsible for taking the lead role for the purpose of coordination between disciplines to ensure the work is completed as shown on the plans and specified. Work for renovation generally includes new drywall ceilings; new acoustical ceiling tile and grid; new moisture-resistant wall board behind all new wall tile; remove and replace damaged metal studs; new tile floor shall be sloped to existing drain locations; new toilet partitions and toilet accessories; new AerDec Sink System and structural supports; new internally illuminated panel system at entry; new counter mounted panel system; Interior painting; new door, frame, and hardware; new signage. Mechanical: Work for renovation generally includes new supply and return air diffusers in accordance with new ACT ceiling and drywall ceilings; Test, balance and commission system, new toilets, flushometers, and faucets. Electrical: Work for renovation generally includes new breakers, conduit and wiring, new receptacles; new dimmable recessed LED light fixtures and occupancy sensors; new AerDec Sink System to include hard-wired deck mounted hand dryer at each lavatory in addition to battery operated faucet and soap dispenser; new automatic paper towel dispensers.
AvailableRenovate classrooms/administration building and auditorium.
Posted Date
Dec 19, 2025
Due Date
Jan 27, 2026
Release: Dec 19, 2025
Close: Jan 27, 2026
Renovate classrooms/administration building and auditorium.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →