Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes install two (2) backflow control valves to prevent stormwater backflow into the citys drainage system during periods of high-water flow from the adjacent c-14 canal. In addition, the project involves dredging of accumulated sediment to restore channel capacity, stabilization of embankments to prevent erosion and maintain structural integrity, and the rehabilitation of existing culverts through the installation of high-density polyethylene (hdpe) liners.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work consists of a new stormwater pump station c-14 stormwater pump station.
Posted Date
Nov 16, 2025
Due Date
Jan 8, 2026
Release: Nov 16, 2025
Close: Jan 8, 2026
Work consists of a new stormwater pump station c-14 stormwater pump station.
AvailablePremium
Access the largest public sector contact database
Replacement of existing station pumps, valves, piping, exterior door and cable hoists at pump stations 5, 14, and 38. Electrical upgrades, including building modifications, site lighting, and transfer switches at pump stations 14 and 38. Replacement of miscellaneous metals, piping, and valves at pump station 53. 4.Installation of corrosion control equipment at pump stations 53 and 57.
Posted Date
Nov 19, 2025
Due Date
Jan 8, 2026
Release: Nov 19, 2025
Close: Jan 8, 2026
Replacement of existing station pumps, valves, piping, exterior door and cable hoists at pump stations 5, 14, and 38. Electrical upgrades, including building modifications, site lighting, and transfer switches at pump stations 14 and 38. Replacement of miscellaneous metals, piping, and valves at pump station 53. 4.Installation of corrosion control equipment at pump stations 53 and 57.
AvailableImprovements to the existing Well No. 4 pump station; improvements to two existing booster pump stations; installation of a cathodic protection system at the existing Reservoir No. 2, along with miscellaneous electrical and control improvements; construction of a new treatment building, including sodium hypochlorite and polyphosphate injection systems.
Posted Date
Nov 25, 2025
Due Date
Dec 18, 2025
Release: Nov 25, 2025
Close: Dec 18, 2025
Improvements to the existing Well No. 4 pump station; improvements to two existing booster pump stations; installation of a cathodic protection system at the existing Reservoir No. 2, along with miscellaneous electrical and control improvements; construction of a new treatment building, including sodium hypochlorite and polyphosphate injection systems.
AvailableWork includes demolition and replacement of three horizontal split case pumps and installation of one additional horizontal split case pump, including all associated valves, piping, and appurtenances. The project also includes installation of a new room within the pump station to house new vfds, demolition and replacement of the HVAC system within the pump station, demolition and replacement of large diameter yard piping, valves, and appurtenances, and modifications to the sanitary sewerage system. All supporting civil, structural, plumbing, electrical, and instrumentation work is also included in the project. See outside link.
Posted Date
Dec 9, 2025
Due Date
Jan 20, 2026
Release: Dec 9, 2025
Close: Jan 20, 2026
Work includes demolition and replacement of three horizontal split case pumps and installation of one additional horizontal split case pump, including all associated valves, piping, and appurtenances. The project also includes installation of a new room within the pump station to house new vfds, demolition and replacement of the HVAC system within the pump station, demolition and replacement of large diameter yard piping, valves, and appurtenances, and modifications to the sanitary sewerage system. All supporting civil, structural, plumbing, electrical, and instrumentation work is also included in the project. See outside link.