Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide comprehensive design, deconstruction, construction, and installation of a new playground. Remove and dispose of all existing equipment, mulch, and other debris. Poured in place rubber is required for this project. The coloration shall match equipment within the scope of this project with a preference of it not contrasting poured in place rubber matting and equipment in other playground areas. Astm f1487 (playground equipment). Astm f1292 & astm f3313 (impact attenuation of playground surfaces).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
This project consists of newly constructed and refurbished park elements within the Park site, as well as a new sidewalk. Work inside the park includes, but is not limited to: new and repaved asphalt multi-use trails; pre-cast concrete retaining walls; custom handrails; a pre-fabricated bridge crossing; concrete walks, ADA ramps, and pedestrian plaza areas; repaving of paved driveways and parking areas; realignment, regrading, and paving of drive aisles and ADA parking; renovation of a restroom facility, enhancements to storm water structures; addition of green infrastructure and enhanced swales; new dam installations; streambank restoration and slope stabilization; installation of chain link fencing; general landscape improvements; and other items as shown in the plans and specifications.
Posted Date
Dec 9, 2025
Due Date
Jan 22, 2026
Release: Dec 9, 2025
Close: Jan 22, 2026
This project consists of newly constructed and refurbished park elements within the Park site, as well as a new sidewalk. Work inside the park includes, but is not limited to: new and repaved asphalt multi-use trails; pre-cast concrete retaining walls; custom handrails; a pre-fabricated bridge crossing; concrete walks, ADA ramps, and pedestrian plaza areas; repaving of paved driveways and parking areas; realignment, regrading, and paving of drive aisles and ADA parking; renovation of a restroom facility, enhancements to storm water structures; addition of green infrastructure and enhanced swales; new dam installations; streambank restoration and slope stabilization; installation of chain link fencing; general landscape improvements; and other items as shown in the plans and specifications.
AvailableUnity Park Playground Improvements Project.
Posted Date
Dec 3, 2025
Due Date
Jan 7, 2026
Release: Dec 3, 2025
Close: Jan 7, 2026
Unity Park Playground Improvements Project.
AvailableProcurement of services for the Quidnick Improvement Project, including site preparation, Owner-furnished playground equipment installation, site furnishings, stormwater management, fencing, and landscape restoration. An alternate bid is also included for similar improvements at Harris Playground.
Posted Date
Dec 2, 2025
Due Date
Jan 9, 2026
Release: Dec 2, 2025
Close: Jan 9, 2026
Procurement of services for the Quidnick Improvement Project, including site preparation, Owner-furnished playground equipment installation, site furnishings, stormwater management, fencing, and landscape restoration. An alternate bid is also included for similar improvements at Harris Playground.
AvailableWork is to design, remove existing playground, supply and install new playground equipment, utilizing the existing shade cover, and fall zone material for Park. This project requires a contractor to design, supply and install a commercial grade playground system including fall zone material and utilize the existing stand-alone shade cover. Work is to include providing design of a minimum 3,000 square foot play area, excavation, grading, curbing, the installation of commercial grade playground equipment, equipment footings, drainage materials, landing mats, geotextile fabric and fall zone material.
Posted Date
Dec 16, 2025
Due Date
Jan 16, 2026
Release: Dec 16, 2025
Close: Jan 16, 2026
Work is to design, remove existing playground, supply and install new playground equipment, utilizing the existing shade cover, and fall zone material for Park. This project requires a contractor to design, supply and install a commercial grade playground system including fall zone material and utilize the existing stand-alone shade cover. Work is to include providing design of a minimum 3,000 square foot play area, excavation, grading, curbing, the installation of commercial grade playground equipment, equipment footings, drainage materials, landing mats, geotextile fabric and fall zone material.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis